|
COMMERCE BUSINESS DAILY ISSUE OF JULY 31,1998 PSA#2149DLA, Defense National Stockpile Center, Directorate of Stockpile
Contracts, 8725 John J. Kingman Road, Suite 4616, Fort Belvoir, VA
22060-6223 S -- BUNDLING,BANDING, WEIGHING AND RELOCATING METAL MATERIALS SOL
SPO833-98-B-0181 DUE 080798 POC Point of Contact -- Wilbert C. Payne,
Contract Specialist, (703)n 767-5346 WEB: DNSC HOMEPAGE,
http://www.dnsc.dla.mil. E-MAIL: wilbert_payne@hq.dla.mil,
wilbert_payne@hq.dla.mil. DEFENSE NATIONAL STOCKPILE CENTER is
soliciting Bids for bundling, banding, weighing and relocating
approximately 4,500 MT of Lead at the Somerville, NJ Depot; and 35,293
MT of Zinc at the Voorheesville, NY Depot. Period of performance is
180 calendar days and 365 days respectively. This is a 100% small
business set-aside under Standard Industrial Classification (SIC) code
8999. The small business size standard is $5 million. This is a
Combined synopsis/solicitation for Materials Handling prepared in
accordance with the format in subpart 12.6, as supplemented with
additional information included in this notice. This announcement
constitutes the only solicitation; proposals are being requested and a
written solicitation will not be issued. SPO833-98-B-0181 is issued as
a Invitation to Bid (IFB). The Solicitation document and incorporated
provisions and clauses are those in effect through Federal Acquisition
Circular 97-4. This is a 100% small business set-aside under Standard
Industrial Classification (SIC) code 4212. The small business size
standard is 500 employees. 1. CLIN 0001 (Lead) -- Somerville, NJ Depot
Remove approximately 4,500 metric tons of Lead from current storage,
place the bundle on a scale adding or removing ingots as may be
required to form bundles weighing approximately one metric ton (2,204
lbs); and after banding and crimping, the Contractor shall relocate the
completed bundle to open area G or H for storage, which is
approximately 500 feet from the scale. 2. The material is in the form
of ingots. (The Contractor may be required to handle each ingot in
order to build the bundles). Only one brand and type of lead will be
placed in the bundle. The Contractor shall verify that the material is
properly segregated and only one brand of lead shall be placed onto a
lift. No mixing of brands shall be allowed (the number of pieces in a
bundle will vary according to brand). After material has been weighed,
a Government representative shall mark the weight on each bundle. The
Contractor shall remove the weighed bundle and securely band the bundle
with three, 1-1/4 inch galvanized steel bands and double crimp. Bands
are to be placed in such a way as to prevent any ingots from slipping
out of the bundle. Sequence of work can be altered after the bundles
have been weighed, banded and the ingot count per bundle has been
established per brand. The daily rate of production will be 150 metric
ton bundles, weighed, banded and stored. Hours of operation at
Somerville are 0700-1600, Monday Friday, no holidays or weekends.
Contractor shall keep the scales free of ice, rain, snow, debris, and
any other foreign material that may affect scale operation and
accuracy. Contractor shall test and check weigh scales each morning and
afternoon after lunch. The Contractor shall utilize a contractor
furnished certified commercial test weight for 2,000 lbs., or an
improvised test weight approved by the Contracting Officer's
Representative (COR). The Government shall establish the tare weight
for the banding and clips. 3. The Contractor shall comply with all
safety requirements of the Occupational Safety and Health Standards (29
CFR 1910). Due to surface oxidation that occurs during long term
storage of lead, fine particles of lead and lead compounds may become
airborne during movement and handling of the lead. Therefore, the
potential exists to create occupational health problems
(ingestion/inhalation) during the movement and/or handling of the
metal. In order to protect persons moving, handling, weighing, and
banding lead from exposure to lead and its compounds, all personnel
shall wear full protective equipment at all times. Prior to
starting-up, the Contractor shall provide proof of medical
acceptability for its employees to wear respiratory protection, and a
copy of their blood lead levels to the Contracting Officer. If the
aforementioned is acceptable, the Contractor shall provide each
employee with coveralls or similar full-body protective clothing, head
coverings, and gloves. Sleeves and pant cuffs shall fit snugly around
the individual's wrists and ankles. If protective clothing is ripped
or torn, it shall be replaced immediately. If cloth coveralls are used
by personnel, maintenance and laundering of soiled clothing shall be
in accordance with 29 CFR 1910.1025. Respiratory protection in the form
of respirators with appropriate filters shall be worn by all Contractor
personnel in the work areas. The Contractor shall ensure that its
employees wear safety shoes and safety glasses or goggles. These
requirements shall remain in place until the required air monitoring is
evaluated by the Contractor and the Contractor determines that the
requirements for protective clothing and respiratory protection can be
changed. The Contractor shall provide a copy of its determination in
writing to the Contracting Officer along with the analysis results
required by this Section. The Contractor shall perform testing in
accordance with 29 CFR 1910.1025, and if the action level or
permissible exposure limit is exceeded, the Contractor shall continue
to comply with requirements for personnel protective equipment,
training, medical surveillance, and hygiene facilities and practices.
The Contractor shall advise its personnel of the health and safety
hazards associated with the handling of lead ingots. A copy of the
Material Safety Data Sheet (MSDS) for lead shall be provided to the
Contractor. Air Monitoring a minimum of five (5) days full shift
(minimum of 7 hours) monitoring under full scale operating conditions.
Sampling shall be conducted on all designated positions. Accurate
records shall be maintained on the task and time the person being
sampled performs each task. Air sampling shall be conducted by a firm
qualified to perform air monitoring unless the Contractor has a
qualified industrial Hygienist on its staff. This sampling shall be
conducted within one week of the start up of full scale operations and
results provided to the Contracting Officer within one week after the
samples are submitted to an approved laboratory for analysis. The
Contractor shall submit a clear and concise Safety and Health Plan
which clearly addresses all pertinent requirements outlined in 29 CFR
1910.1025 before beginning work. Additionally, the Contractor shall
identify the laboratory to be used for analysis of samples taken during
the course of this contract work. This laboratory shall be approved by
the National Institute of Standards and Technology's National
Voluntary Laboratory Accreditation Program (NVLAP). Copies of
laboratory analyses of samples shall be submitted to the Contracting
Officer immediately upon receipt by the Contractor. The Government may
during the course of this contract conduct air monitoring tests to
determine levels of airborne dust and lead which will require
Contractor employees to wear air monitoring equipment. The Contractor
shall ensure cooperation of its employees for such tests. In the event
laboratory analysis of air samples taken either by the Contractor or
by the Government indicates worker exposure to lead in excess of limits
established by 29 CFR 1910.1025, the Government reserves the right to
cease operations in those areas in order to protect workers from such
exposure. Operations may not resume until the Government determines the
risk of exposure has been adequately reduced. 4. Government shall
furnish 1-1/4 inch galvanized banding, clips for crimping, dunnage
lumber, empty drums, scale, dumpsters, and aluminum tags. The
Government shall supply a decontamination station, washing machine and
dryer. The Government shall furnish the scale for weighing, space for
material handling equipment, and dumpsters for excess debris. 5. The
Contractor shall provide all supplies, material and equipment, not
provided by the Government, that are necessary for the performance of
the work, including but not limited to: banding equipment, crimpers,
and all necessary safety materials and supplies, such as safety shoes
(steel toes), safety eyewear, full protective clothing and work gloves
for employees; portable toilet facilities, drinking water, and
portable wash stations. 6. CLIN 0002 (Zinc) Chambersburg, PA Depot
CANCELLED -- . 7. CLIN 0003 (Zinc) Voorheesville, NY Depot Remove
approximately 35,293 metric tons of zinc from current storage,
transport to a scale, approximately 300 feet. After banding and
crimping, the contractor shall relocate the completed bundle to a
storage area, 300 feet from the scale, and place the bundles on 1" X 4"
hardwood dunnage lumber, supplied by the government, in truck load lots
(approximately 22 completed bundles)weigh, band, crimp, and relocate
approximately 3000 feet to another storage area. Contractor shall
remove zinc from its current blockstack storage, segregate by brand, if
required, clean slabs of any accumulated dirt and debris, and transport
to a government supplied scale and place the bundle on a scale adding
or removing slabs as may be required to form bundles weighing
approximately one metric ton (2204 lbs. Only one type of brand and
grade of zinc should be placed in a bundle. If segregation of brand and
grade by hand is required, the contractor shall manually handle each
piece prior to building zinc bundles. Stacking patterns will vary for
different brands of zinc. The Government representative will witness
the weighing and mark the weight on each bundle. The contractor will
then remove the weighed bundle and securely band the bundle with three
(3) 1-1/4 galvanized bands and double crimp. Bands are to be placed in
such a manner as to prevent any slabs from slipping out of the bundle.
Contractor shall be required to attach an embossed aluminum truckload
identification tag provided by the government, to the last bundle in
each truckload lot. After banding, the Contractor shall treat the crimp
seal with a clear lacquer or corrosion inhibiting material to prevent
rusting of the strapping material. This lacquer or corrosion inhibiting
mater shall not react with or have any deleterious effect on the zinc.
Rate of production shall be 200 complete metric ton bundles per day.
Sequence of work can be altered after bundles have been weighed and an
established ingot count per brand, per bundle has been established.
The Contractor shall meld any broken pieces into existing sub-stacks
and kept segregated by grade and brand. Broken slabs not incorporated
into sub-stacks shall be placed in drums furnished by the Government.
The Government shall determine the tare weight of the drum and after
filling drums weigh the drum. The COR shall mark the gross, tare, and
net weight on the drum, as well as the grade and brand of zinc.
Contractor shall keep the scales free of ice, rain, snow, debris, and
any other foreign material that may affect scale operation and
accuracy. Contractor shall test and check weigh scales each morning and
afternoon after lunch. The Contractor shall utilize a contractor
furnished certified commercial test weight for 2,000 lbs., or an
improvised test weight approved by the Contracting Officer's
Representative (COR). Government shall furnish 1-1/4 inch galvanized
banding, clips for crimping, dunnage lumber, empty drums, scale,
dumpsters, and alumunum tags. The Contractor shall provide all
supplies, material and equipment not provided by the Government that
are necessary for the performance of the work, including but not
limited to: banding equipment, corrosion inhibitor, crimpers, all
necessary safety materials and supplies such as safety shoes (steel
toe), safety glasses with side shields and work gloves for employees.
Contractor shall be responsible for furnishing all necessary utilities
that would include but not limited to electricity, portable toilets,
water and telephone. Contractor may be required to water down work
areas to reduce the airborne dust generated during banding and weighing
operations; Contractor shall supply the necessary water and hoses.
Office space and closed storage space for equipment and supplies is not
available. Hours of work at Voorheesville are 0800 1500 M-Th; 0900 1500
Fridays, excluding holidays and weekends at both depots. 9. FAR
52.212-1, Instructions to Offerors-Commercial (APR 1998) and FAR
52.212-4, Contract Terms and Conditions-Commercial Items (APR 1998)
apply to this IFB and any resultant acquisition. Offerors shall include
a completed copy of FAR 52.212-3, Offeror Representations and
Certifications-Commercial Items (JAN 1997) with its offer. FAR
52.212-5, Contract Terms and Conditions Required to Implement Statutes
or Executive Orders-Commercial items (APR 1998) applies to this IFB
and any resultant acquisition. The following FAR clauses cited in this
clause are also applicable: 52.222-26, 52.222-35, 52.222-36,
52.222-41, 52.228-5, 52.237-1, and 52.233-9000 (DLAD). The Government
contemplates making multiple firm fixed-price awards by CLIN unit price
per metric ton to the lowest, responsible offerors. Bids may be
submitted to the above address, C/O Bid Custodian, Suite 4616 (Mail) or
Suite 4528 (Hand-Delivered) Telephonic, telegraphic or faxed bids will
not be accepted. Bids must be received by close of business 8/7/98.
Questions may be submitted to the Point of Contact named herein. Posted
07/29/98 (W-SN230055). (0210) Loren Data Corp. http://www.ld.com (SYN# 0121 19980731\S-0010.SOL)
S - Utilities and Housekeeping Services Index Page
|
|