|
COMMERCE BUSINESS DAILY ISSUE OF JULY 23,1998 PSA#2143Sandia National Laboratories, 1515 Eubank Southeast, Mailstop:0222,
Albuquerque, NM 87185 C -- ARCHITECT AND ENGINEERING SERVICES -- JOINT COMPUTATIONAL
ENGINEERING LABORATORY (JCEL) SOL BD-5971 DUE 081298 POC Erlinda
Silva-Sweeney (505) 844-1843 E-MAIL: ejsilva@sandia.gov,
ejsilva@sandia.gov. Joint Computational Engineering Laboratory (JCEL).
Sandia National Laboratories, Albuquerque New Mexico (SNL/NM) intends
to contract for Architect-Engineering (AE) services, subject to
availability of funds, to complete a Program Document, with the option
of completing the remainder of Title I, and Title II design and
documentation for JCEL. Title I will include a Program Document,
Schematic Design, and Design Development. Title II will follow with
Contract Documents. There is also an option to proceed with Title III
(construction administration). Title I design is anticipated to begin
in January of 1999. The JCEL facility will focus on research,
development and application of leading-edge, high-end computational and
communications technologies. JCEL will be the center for SNL's
computational modeling, analysis and design community. JCEL's primary
mission is to ensure the rapid development and application of high-end
computing, modeling, analysis and design needed to achieve the
objectives of DOE's Science-Based Stewardship and Management program.
Qualified firms shall have demonstrated experience with the design of:
high-end computational and communications facilities, computer
operations facilities, dynamic environments for office, meeting and
teaming spaces of computing organizations, integrated energy efficient
building systems, high-functioning energy management control systems
(EMCS), corporate standard and state-of-the-art communications systems,
and multi-level, flexible security and building control systems. JCEL
will include a multi-story office building with a mixture of single,
double and management offices, support and teaming spaces, meeting
rooms and computer labs. There will also be a one-story section with
computer prototyping, multi-purpose and multi-media laboratory, office
and support space. The building area is estimated between 50,000 and
60,000 gross square feet. The estimated cost of construction for the
JCEL is $10 to $15 million. A fixed price AE services contract is
anticipated.The project design is estimated to be approximately 5%
civil, 15% structural, 30% architectural, 20% mechanical and 25 %
electrical and 5% EMCS. AE firms submitting proposals shall have
minimum experience of: projects with building areas of 40,000 s.f. or
more, projects with construction budgets of $9,000,000 or more,
projects of a similar building type and scope, and a proven capability
of preparing CADD files in MicroStation 95 or later. AE Firms
submitting proposals shall include this information in their letter of
interest. All interested firms should submit a letter of interest
together with nine (9) copies of a proposal for AE services. The
proposal should include standard forms SF254 and SF255. The proposal is
limited to 50 pages including the SF254/255 but not including the
letter of interest. The proposals for AE services will be evaluated and
scored by a committee of SNL personnel based on best value procurement
procedures. The proposals shall follow the following format: A.
Company information and consultants as applicable: 1. Brief history of
company 2. Brief history of working experience with proposed
consultants if applicable 3. Identify company's experience with
projects similar in scope and functionality to that of the proposed
JCEL project 4. Explain company's experience with the software that
will support the JCEL project, including MicroStation experience B.
Project Team to include the project manager, discipline leads
(including CADD), design personnel, and consultant personnel, if
applicable (individuals named in the proposal will be part of the
contract; unavailability of these individuals at the time of award
constitutes a basis for disqualification) 1. Organization chart
illustrating relationship of key personnel and consultants 2. Define
each team member's roles and responsibilities 3. Identify experience of
each team member, professional designation, certification, education,
and technical experience 4. Identify projects, specifically relevant to
JCEL, which proposed team members have worked on jointly C. Programming
1. Define project team's methodology and techniques for gathering
building occupant and landlord requirements and developing building
design concepts 2. Explain how project team will incorporate the
gathered programming information into a functional building Program
Document D. Work Plan 1. Define your corporate plan in a step-by-step
approach for executing the JCEL project. This should be inclusive of
but not limited to a descriptive explanation of activities and
interfaces to occur at each step, schedule tracking procedures, cost
estimating techniques and cost controls, internal QA process, and
external QA interface All proposals must be submitted in writing. No
telephone responses will be accepted. Responses and questions should be
directed to Sandia National Laboratories, attention Erlinda
Silva-Sweeney, mail stop 0222, P.O. Box 5800, Albuquerque, New Mexico
87185-0222. Posted 07/21/98 (W-SN226538). (0202) Loren Data Corp. http://www.ld.com (SYN# 0013 19980723\C-0001.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|