|
COMMERCE BUSINESS DAILY ISSUE OF JULY 20,1998 PSA#2140Tahoe National Forest, 631 Coyote Street, Nevada City, Ca 95959-2250 Y -- LOGAN CANYON TRAIL BRIDGE CONSTRUCTION SOL RFQ-17-98-77 DUE
090998 POC Henry R. Hansen, Contracting Officer, 530-478-6122, FAX
530-478-6126 Work shall consist of the construction of a 45 foot trail
bridge. Design will be steel I beam with wood decking and wood
railing. There will construction of concrete footings, abutments and
wing walls. Some clearing and grubbing including felling of one or more
trees. Price range under $100,000. The project is located on the Nevada
City Ranger District past the town of Washington. Proceed through
Washington crossing the So. Yuba River and turn left onto the Relief
Hill Road #36 0.5 mile past the bridge. Travel west to the South Yuba
Trailhead. Project starts approximately 4 miles down the trail in the
Logan Canyon drainage. Solicitation issue date 081098. Contract time 72
days. Posted 07/16/98 (W-SN224223). (0197) Loren Data Corp. http://www.ld.com (SYN# 0133 19980720\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|