|
COMMERCE BUSINESS DAILY ISSUE OF JULY 1,1998 PSA#2128USDA Forest Service, Black Hills National Forest, RR 2 Box 200, Custer,
SD 57730 Z -- TRAM STABILIZATION SOL RMAST-98-155 DUE 080598 POC Contract
Brenda Oster 605/673-2251, Joel Butzin Contracting Officer 970/874-6613
Purpose of this project is to stabilize tram by reconstructing tram
cable support structure (counterweight), reconstructing tram foundation
and repositioning the tram terminal/ore bin, replacing the roof,
fencing and site and installing a clay liner over the site. Project is
the Fall Creek Tram at Primos Siding. Located on the Norwood Ranger
District, San Miguel County, CO, GMUG National Forest. Contract time is
30 calendar days. Estimated bid range is between $25,000 -- $100,000.
All responsible sources will be considered by the agency. Posted
06/29/98 (0180) Loren Data Corp. http://www.ld.com (SYN# 0130 19980701\Z-0010.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|