COMMERCE BUSINESS DAILY ISSUE OF JUNE 5,1998 PSA#2110Bureau of Reclamation, Contracts Group, 1150 N. Curtis Road, Suite 100,
Boise, Idaho 83706-1234 Y -- PHOENIX DIVERSION OUTLET STRUCTURE SOL 1425-98-SQ-10-00370 DUE
070398 POC Sue Fraser, 208-378-5103 E-MAIL: Click here to contact the
contracting officer via, sfraser@pn.usbr.gov. The Bureau of
Reclamation, Tieton Dam, Yakima Project, Washington, has a requirement
as follows: It is required that there be constructed and completed in
accordance with the contract provisions and clauses, these
specifications, and the drawings listed in the List of Drawings hereof,
FISH PASSAGE AND PROTECTIVE FACILITIES, PHOENIX DIVERSION OUTLET
STRUCTURE, ROGUE RIVER BASIN PROJECT, TALENT DIVISION, OREGON. The work
is located in Jackson County, approximately 7 miles southwest of
Medford, Oregon. DESCRIPTION OF THE WORK The principal components of
the work to be performed under these specifications include the
following: a. Clearing and grubbing. b. Diversion and care of the
stream, and removal of water from foundations and pipe trench. c.
Earthwork for and construction of the following:(1) A fish return
pipeline and reinforced concrete fish return pipe outlet structure.(2)
Furnishing and placing grouted riprap and bedding.(3) Furnishing and
constructing a construction access with CMPs. d. Site grading. e.
Replanting as required by permits. SIC 1629, size standard $17 million.
Written or facsimile request for RFQ 1425-98-SQ-10-00370 will be
accepted. FAX number is 208-378-5108. Telephone requests will not be
accepted. See Numbered Note #1. (0154) Loren Data Corp. http://www.ld.com (SYN# 0102 19980605\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|