|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- REPLACE RICE MILL ELEVATOR, U. S. COAST GUARD BASE
- INSTALL SINKS
- REROOF BUILDING 89, MACDILL AFB, FL
- CHEMICAL WEAPONS PRODUCTION FACILITY DISMANTLEMENT
- PAINTING OF FUEL STORAGE TANKS
- REHABILITATION OF THREE COTTAGES AT U. S. COAST GUARD
- REPAIR CHAPEL 2, BUILDING 3827 AT MC GUIRE AFB, NJ
- RESTORATION OF THE ENTRANCE STEPS AND PLAZA, NATIONAL
- REPAIR ROOF, BLDG 807
- SATUS WATER & SEWER IMPROVEMENTS AND WHITE SWAN
- PRE-SOLICITATION NOTICE FOR ORGANIC SOLVENT DEGREASER
- PRE-SOLICITATION NOTICE FOR ORGANIC SOLVENT DEGREASER
- HYDRAULIC IMPROVEMENTS, NAVAL SUPPORT ACTIVITY, NEW
- REPAIR EXTERIOR OF BUILDING 410
- RENOVATE HEADS, BUILDING 603, 4TH FLOOR, NAVAL SUPPORT
- ALERT IMAGE RENOVATIONS TO MISSILE ALERT FACILITIES
- RENOVATE FACILITY FOR LONGBOW PROGRAM, HANCHEY ARMY
- RENOVATE HEADS, BUILDING 601, NAVAL SUPPORT ACTIVITY,
- REPAIR AIRFIELD LIGHTING CIRCUIT
- ENHANCED FLIGHT SCREENING PROGRAM -- HONDO ONLY
- INSTALLATION OF 2000KW GENERATOR FOR EMERGENCY POWER
- UPGRADE RENOVATION OF WARDS B2 AND B3
- ABESTOS ABATEMENT
- FIRE SPRINKLER SYSTEMS, BUILDING 705 AND 711, NAVAL
- PROVIDE AND INSTALL OVERHEAD AND SLIDING GARAGE DOORS
- BRAVO WHARF B-25, DEMONSTRATION PROJECT, NAVAL
- ASBESTOS ABATEMENT REMOVAL, F.O.B., 850 THIRD AVENUE,
- GULF STREAM ROAD & BRIDGE REPLACEMENT ON THE GREEN
- REPLACE WATER STORAGE TANK
- WHITTAKER CREEK PAVING/RENOVATION
- RENOVATE HEADS, BUILDING 603, 5TH FLOOR, NAVAL SUPPORT
- MODIFICATION TO 480 VOLT ELECTRICAL FEED CIRCUIT, FAC
- CHECKOUT AND REFURBISH OF THE REVDA BASE DEFUELING AND
- GRANGEVILLE-SALMON CHIP SEAL
- INSTALL HVAC SYSTEM AT LAUGHLIN AFB, TX
- BOILER INSTALLATIONS, NAVAL AIR STATION, SOUTH
- JOB ORDER CONTRACT (JOC)
- JOHNNY HOPPER PHASE III RECLAMATION IN CHATTOOGA
- ROCK CREEK SLIDE REPAIRS
- REPAIR HIGH TEMPERATURE HOT WATER, PHASE 4, AT MC
- PAINT EXTERIORS, MFH
- PAINT EXHAUST STACKS, CENTRAL HEAT PLANT
- ROCKY MOUNTAIN REGION BUILDING PAINTING
- REPAIR ELECTRICAL DISTRIBUTION SYSTEM, PHASE VII, MFH
- REPAIR UTILITIES IN THE MILITARY FAMILY HOUSING AREA,
- MUSKRAT CREEK TRAIL NO. 72
- INSTALL PRODUCT RECOVERY SYSTEM
- UPGRADE BUILDING ACCESS, CEREAL CROPS RESEARCH LAB,
- INSTALL NEW FIRE SPRINKLER SYSTEM, BUILDINGS 273 AND
- REPLACE A/C SYSTEM, BUILDING 10, NAVAL SUPPORT
- ROCKY MOUNTAIN REGION FIBERGLASS BUILDING REPARIS,
- REPAIR/ALTER BASE OPERATIONS
- REPLACE A/C SYSTEM, BUILDING 58, NAVAL SUPPORT
- REPAIR SEWER LINE
- PAINT EXTERIORS, MFH
- REPAIR HEATING SYSTEMS, BUILDING 583 & 81
Today's CBD Index Page
Created on May 30, 1998 by Loren Data Corp. --
info@ld.com
|
|
|