COMMERCE BUSINESS DAILY ISSUE OF JUNE 1,1998 PSA#2106Eldorado National Forest, 100 Forni Road, Placerville, CA 95667 56 -- INYO -- BRISTLECONE PINE ROAD SOL RFQ-R5-03-98-47 DUE 061198 POC
Kathy Griffin, Contracting Officer, 530-622-5061, FAX 530-621-5258 This
is a combined synopsis/solicitation for commercial items prepared in
accordance with the format in Subpart 12.6, as supplemented with
additional informatin included in this notice. This announcement
constitutes the only solicitation; quotes are being requested and a
written solicitation will NOT be issued. The solicitation document and
incorporated provisions and clauses are those in effect through
Federal Acquisition Circular 97-04. SIC code 2951. UNIT EST QTY. UNIT
PRICE AMOUNT (01) Polymer Modified Asphaltic Emulsion; Cationic, Grade
PMCRS2h; Includes delivery to the job site. TON 195 $ $ (02)
Distributor truck speading time HOUR 80 $ $ (03) Transport Truck
unloading time in excess of two hours. HOUR 16 $ $ (04) Fog Seal liquid
asphalt, Grade CSS1h, 0.10 Gal/SY, prediluted with water at the plant
to a 50:50 mixture, includes delivery and spreading. TON 54 $
$____________ TOTAL BID $______________ Specs -- Asphaltic Emulsions
and Distributor Trucks shall meet Caltrans Standard Specification, July
1992. Two distributor trucks shall be provided at all times the asphalt
emulsion is being spread. Tentative time for the work is 7/6 to 7/9
9:00 am-5:00 pm. The Government will give the supplier 2 weeks prior
notice of the required start date and time. The supplier shall provide
instruction on the techniques of chip sealing with the Asphaltic
Emulsions prior to the start of work. The supplier shall have a
representative on the job during the first day of work. The
instructor/representative shall be a technical expert in chip sealing
with at least 5 years experience in chip sealing. The supplier shall
test two aggregate samples provided by the Government for compatibility
with the Asphaltic Emulsion and determine an initial application rate
for both the Asphaltic Emulsion and the Aggregate. Payment for the
instruction, representative on the site, and testing of the aggregate
shall be included in the unit price of the Asphaltic Emulsion. Payment
for the distributor truck spreading time will begin at the scheduled
start time or the actual start time if earlier than the scheduled start
time. The time will end each day at the completion of work. Standby
time will begin 2 hours after the scheduled delivery time or on arrival
if later. Payment will begin 2 hours after the beginning of unloading
if the unloading starts earlier than the scheduled delivery time.
Payment will end when unloaded or when released from the job site.
Delivery Info -- Delivery shall be made to several locations within the
job site. To reach the job site turn east off of US Highway 395 just
North of Big Pine, CA. onto Hightwy 168. Proceed East for 13 miles to
reach the Bristlecone Pine Road. The project starts at the intersection
and continues for 10.3 miles to the North on the Bristlecone Pine Road.
The road climbs from Big Pine to the end of the job at 10,000 feet in
elevation. Quotes are due at close of business on JUNE 11, 1998. Quote
information may be faxed to 530-621-5258. The provisions at: 52.212-1,
Instructions to Offeror-Commercial; 52.212-4 Contract Terms and
Conditions-Commercial Items; and 52.212-5 Contract Terms and Conditions
Required to Implement Statutes or Executive Orders-Commercial Items,
apply to this acquisition. The provision at 52.212-2,
Evaluation-Commercial Item applies, the factors are experience, past
performance, and quality and they are equal to price. A completed copy
of the provision at 52.212-3, Offeror Representatives and
Certifications-Commercial Items shall be included with the quote. A
copy of the provisions referenced may be obtained upon request from the
Eldorado National Forest, 530-621-5295 or electronically @
http://www.safaq.hq.af.mil/contracting/library.html (0147) Loren Data Corp. http://www.ld.com (SYN# 0332 19980601\56-0003.SOL)