COMMERCE BUSINESS DAILY ISSUE OF MAY 28,1998 PSA#2104Ochoco National Forest, PO Box 490, Prineville, OR 97754 99 -- SUPPLY OF CULVERTS, PIPE ARCHES, & MULTI-PLATE ARCHES SOL Sol.
No. 7-98-R30 DUE 060398 POC Contact Point, Sandra Chandler,
541-416-6531, FAX 541/416-6661 (i) This is a combined
synopsis/solicitation for commercial items prepared in accordance with
the format in Subpart 12.6, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation; quotations are being requested and a written
solicitation will not be issued. (ii) 7-98-R30. This solicitation is
issued as a Request for Quotation (RFQ). (iii) The solicitation
document and incorporated provisions and clauses are those in effect
through Federal Acquisition Circular 97-04. (iv) Standard Industrial
Classification Code is 3498; the small business size standard is 500
employees. This is a 100% small business set aside. (v & vi) Item 1)
Pipe Arch -- 1 each, 1956mm x 1321mm, thickness -- 2.77mm steel or
2.67mm aluminum, corrugations -- 68mm x 13mm, length -- 12m; Item 2)
Pipe Arch -- 2 each, 1956mm x 1321mm, thickness -- 2.77mm steel or
2.67mm aluminum, corrugations -- 68mm x 13mm, length -- 11m; Item 3)
Culvert -- 5 each, 610mm, thickness -- 1.63mm steel or 1.52mm aluminum,
corrugations -- 68mm x 13mm, length -- 11m; Item 4) Culvert -- 1 each,
610mm, thickness -- 1.63mm steel or 1.52mm aluminum, corrugations --
68mm x 13mm, length -- 12m; Item 5) Pipe Arch -- 1 each, 1070mm x
740mm, thickness -- 2.01mm steel or 1.91mm aluminum, corrugations --
68mm x 13mm, length -- 12m; Item 6) Pipe Arch with step beveled end
sections at both ends -- 1 each, 3607mm x 2311mm, thickness -- 3.50mm
steel, corrugations -- 76mm x 25mm, length -- 21m, 2-foot step at top,
1 1/2:1 bevel; Item 7) Pipe Arch with step beveled end sections at
both ends -- 1 each, 3480mm x 2210mm, thickness -- 3.50mm steel,
corrugations -- 76mm x 25mm, length -- 16m, 2-foot step at top, 1 1/2:1
bevel; Item 8) Pipe Arch with step beveled end sections at both ends --
1 each, 2410mm x 1725mm, thickness -- 2.77mm steel, corrugations --
76mm x 25mm, length -- 23m, 1-foot step at top, 1 1/2:1 bevel; Item 9)
Culvert -- 1 each, 1220mm, thickness -- 2.77mm steel, corrugations --
68mm x 13mm, length -- 16m; Item 10) Culvert -- 1 each, 910mm,
thickness -- 2.77mm steel, corrugations -- 68mm x 13mm, length -- 15m;
Item 11) Pipe Arch with step beveled end sections at both ends -- 1
each, 3607mm x 2311mm, thickness -- 3.50mm steel, corrugations -- 76mm
x 25mm, length -- 12m, 2-foot step at top, 1 1/2:1 bevel; Item 12)
Pipe Arch with step beveled end sections at both ends -- 2 each, 1803mm
x 1194mm, thickness -- 3.50mm steel, corrugations -- 68mm x 13mm,
length -- 14m, 1-foot step at top, 1 1/2:1 bevel; Item 13) Pipe Arch
with step beveled end sections at both ends -- 2 each, 1245mm x 838mm,
thickness -- 2.77mm steel, corrugations -- 68mm x 13mm, length -- 13m,
1-foot step at top, 1 1/2:1 bevel; Item 14) Pipe Arch with step beveled
end sections at both ends -- 1 each, 3607mm x 2311mm, thickness 3.50mm
steel, corrugations -- 76mm x 25mm, length -- 12m, 2-foot step at top,
1 1/2:1 bevel; Item 15) Culvert -- 1 each, 610mm, thickness -- 2.67mm
aluminum, corrugations -- 68mm x 13mm, length -- 24m; Item 16)
Multi-plate Arch with step beveled ends and basic channel -- 1 each,
4572mm x 1410mm, 12 gauge steel, with flat bevel, length -- 18m; Item
17) Multi-plate Arch with step beveled ends and basic channel -- 1
each, 4572mm x 1410mm, 12 gauge steel, with flat bevel, length -- 21m;
Item 18) Pipe Arch -- 1 each, 1448mm x 965mm, thickness -- 2.76mm
steel, corrugations -- 68mm x 13mm, length -- 16m. Offeror shall
specify in their quotation whether steel or aluminum is being offered.
(vii) Items 1-7 to be delivered by June 19, 1998 to Lamonta Warehouse,
1175 N. Lamonta Rd, Prineville, OR 97754. Items 8-10 to be delivered by
June 19, 1998 to Chuckwagon Material Source, 36 miles east of
Prineville, including 1 mile of gravel road. Items 11-13 to be
delivered by July 1, 1998 to McGinnis Material Source, 27 miles east of
Prineville, including 1 mile of gravel road. Items 14-18 to be
delivered by July 17, 1998 to Canyon Creek Material Source, 28 miles
east of Prineville. Maps of delivery locations will be provided at time
of award of contract. Delivery shall be made between the hours of 8:00
AM and 4:00 PM Monday through Friday with at least 72-hour
notification prior to delivery. Contractor will be required to off-load
at delivery locations. Inspection and acceptance will be made by
Government at the place of delivery. FOB points will be the delivery
locations. (viii) The provision at 52.212-1 Instruction to Offerors --
Commerical Items, applies to this acquisition. (ix) The provision at
52.212-2 Evaluation -- Commercial Items applies. The specific
evaluation criteria to be included in paragraph (a) of that provision
is past performance and price. (x) Offerors shall include a complete
copy of the provision at 52.212-3., Offeror Representatives and
Certifications -- Commercial Items, with offer. (xi) Clause 52.212-4,
Contract Terms andConditions -- Commercial Items, applies to this
acquisition. (xii) Clause 52.212-5, Contract Terms and Conditions
Required to Implement Statutes or Executive Orders -- Commerical Items,
applies to this acquisition. (xiii) N/A (xiv) N/A (xv) N/A (xvi) Submit
quotations to Ochoco National Forest, 3160 NE Third St., PO Box 490,
Prineville, OR 97754 or by facsimile to 541-416-6661 by 4:30 PM Pacific
Daylight Time on June 3, 1998. Quotation shall include 1) Signed and
dated quotation on letterhead stationery, 2) Item No. and unit price
with extended total, 3) Grand Total, and 4) FAR provision 52.212-3
Offeror Representations and Certifications -- Commercial Items. (xvii)
Contact for information -- Sandra Chandler, 541-416-6531. (0146) Loren Data Corp. http://www.ld.com (SYN# 0352 19980528\99-0006.SOL)
99 - Miscellaneous Index Page
|
|