Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 22,1998 PSA#2101

US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000

A -- ENGINEERING EFFORT FOR CORRECTIVE ACTIONS TO SCS2 FUZE (PAM) SOL DAAE30-98-Q-0124 DUE 052698 POC Paul Milenkowic, Contracting Officer, (973) 724-5391 WEB: US ARMY TACOM-ARDEC Procurement Network, http://procnet.pica.army.mil/procacts.htm. E-MAIL: Shannon Wagner, swagner@pica.army.mil. The U.S. Army TACOM-ARDEC at Picatinny Arsenal, NJ currently has a requirement for an engineering effort which will incorporate corrective actions to the SCS2 Fuze for the Penetration Augmented Munition (PAM) Program. This effort was previously successfully completed using a unique Lawrence Livermore, Reynolds Industry Systems, Inc. (RISI) designed fuze (SCS2) for the Follow Through Charge. Due to duplication costs, the Government plans to utilize RISI for this effort. The contractor is expected to incorporate corrective actions to the SCS2 Fuze to include the redesign of the high voltage connector, make provisions on the Printed Wiring Board (PWB) layout for delay times up to 35 msec (factory set), design the interface between SCS2 and SCS1 (the PAM fuze that provides the high voltage and safe separation time), and identify the critical component qualification levels. The contractor will establish the build process, configuration control, and test procedures, which will be used for future manufacturing. The contractor shall deliver a minimum of four refurbished SCS2 fuzes within 14 weeks after contract award and ship in place. The contractor shall purchase 64 each high voltage connectors and 32 eac IVARCS within 14 weeks after contract award and ship in place . TACOM-ARDEC plans to satisfy this requirement via Sole Sole Source Small Purchase Order to Reynolds Industry Systems, Inc. See Numbered Note 22. (0140)

Loren Data Corp. http://www.ld.com (SYN# 0011 19980522\A-0011.SOL)


A - Research and Development Index Page