|
COMMERCE BUSINESS DAILY ISSUE OF MAY 15,1998 PSA#2096Operational Contracts Division, Construction Branch, AFDTC/PKOC, 205
West D Avenue, Suite 541, Eglin AFB, FL 32542-6862 Z -- REPLACE HVAC/REPAIR ELECTRICAL HANGAR 102, EGLIN AFB, FL SOL
F08651-98-R-0109 DUE 071498 POC Bertha Burns, Contract Specialist,
850-882-5628, Ext. 5268 PRESOLICITATION NOTICE. Eglin AFB has a
requirement to Replace HVAC/Repair Electrical Hangar 102, Eglin AFB,
FL. This project includes furnishing all plant, labor, equipment, and
materials and performing all operation in connection with Replace
HVAC/Repair Electrical Hangar 102, Eglin AFB, FL. This is a "Best
Value" Contract. Award will be made based upon the "Best Value" to the
Government in accordance with FAR 15.3. The Government reserves the
right to award a contract to other than the low proposed price. The
work consists of replacement of HVAC and Electrical systems and all
associated ductwork and wiring for both building wings flanking Hanger
102, Eglin Air Force Base, Florida. This will include the removal of
the existing suspended ceiling system which will be replaced with a new
system at the completion of the mechanical and electrical work. Other
work includes renovation of both the men's and women's toilet
facilities to accommodate the physically handicapped. Toilet room work
includes demolition and replacement of shower partitions and addition
of ceramic tile to new partitions and shower stalls. The existing
facility will not be occupied (and in full operation) during
construction. The area of work will be vacated during construction.
There shall be no interruption of utility services or facilities
operation without prior notification. The contractor shall not impair
existing fire alarm and detection systems. When require4d, contractor
shall provide temporary but equivalent systems. (Work which would
significantly interfere with facility operation must be performed after
facility hours or on weekends). Performance period is 120 calendar
days. The above general description of work does not in any way limit
the responsibility of the contractor to perform all work and furnish
all labor, materials, and equipment complete in accordance with the
plans and specifications. Proposal opening of 14 Jul 98 IS ONLY AN
ESTIMATED DATE. Estimated dollar range is between $500,000 and
$1,000,000. All responsible sources may submit a proposal which shall
be considered by the agency. Firms responding should indicate if they
are a small business. Paper copies of the solicitation will be issued,
but the RFP will be available on the Eglin Home Page at "Contracting
Opportunities," Base Level Contracting, at the following case-sensitive
address: http://eglin.af.mil/opportunities/opportunities.html. Click on
file name listed for this project under construction projects. Paper
copies of the RFP may be obtained for a nonrefundable $20.00 charge.
All request must be submitted in writing. Make check/money order
payable to DFAS/LI, DSSN 6671, and mail along with your written request
to AFDTC/PKOO, 205 West D Ave, Suite 541, Eglin AFB, FL 32542-6862. No
telephone requests for solicitation packages are acceptable. (0133) Loren Data Corp. http://www.ld.com (SYN# 0126 19980515\Z-0012.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|