|
COMMERCE BUSINESS DAILY ISSUE OF MAY 15,1998 PSA#2096USACE VICKSBURG DISTRICT, 4155 CLAY STREET, VICKSBURG, MS 39180-3435 Y -- FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES, BIG SUNFLOWER
RIVER, STEELE BAYOU BASIN, MISSISSIPPI, MAIN CANAL ITEM NO.2 SOL
DACW38-98-B-0019 DUE 070798 POC Contract Specialist GLEN E. SMITH
601/631-5350 (Site Code CW38) The work consists of furnishing all
plant, labor, materials and equipment for channel improvement and for
construction of 9 grade/water control structures along MAin Canal
between Sta. 732+25 and Sta. 1336+19 in Washington County, Mississippi.
Principal features include clearing and grubbing, clearing and
snagging, miscellaneous items, channel excavation, structure
excavation, reinforced concrete, stone protection, engineering fabric,
backfill and fill, miscellaneous metal work, corrugated metal pipe,
control of water, erosion control, and environmental protection. The
estimated value of the work is between $1,000,000 and $5,000,000. Plans
and specifications are available on the Vicksburg Consolidated
Contracting Office (VCCO) Web Page at
http://www2/mvk.usace.army.mil/contract/ and on compact disk at no
charge. Hardcopies will not be available. The CD may be requested by
returning the Pre-Solicitation Notice, mailing your request to VCCO at
4155 Clay Street, Vicksburg, MS 39180-3435, or faxing 601-631-7263.
Issue date is on or about 05 June 98. Bid opening date is on or about
07 July 98. (0133) Loren Data Corp. http://www.ld.com (SYN# 0111 19980515\Y-0017.SOL)
Y - Construction of Structures and Facilities Index Page
|
|