Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 15,1998 PSA#2096

21 Cons/LGCB, 700 Suffolk St., Peterson AFB, CO 80914-1200

71 -- FURNITURE -- 2522 -- TEKNION OFFICE FURNITURE SOL F05604-98-Q-4252 DUE 060198 POC Contact, SSgt Kelly S. Snyder, Contract Specialist, 303-677-6440 or MSgt Dave Thomas, Contracting Officer, 303-677-6446 Contractor shall provide all material and equipment necessary for the reconfiguration and addition of modular office furniture. New furniture shall be Manufactured by Teknion Office Systems. Contractor shall use existing parts (Government Furnished Parts) to complete the job. The modular office furniture will be for the 821st Space Group, Buckley Air National Guard Base CO, facilities T-429, 430 and 431 located within the secured area of Buckley Air National Guard Base. The furniture shall be reconfigured/installed in accordance with plans/drawings already existing and provided by the Governmnet. The contractor shall coordinate for the construction of parts (to match existing in color and style) delivery to the site, propose phase in schedule (to be approved by the Government) and install/construct with minimal disruption of operation. A portion of the parts identified under this contract are currently stored within the secured area of the compound, Contractor shall retrieve from our storage area and use existing parts during reconfiguration. Should deviation from existing plans be required the Government will provide a written description of the changes as soon as conditions permit. If such changes delay the established delivery sequence, the contractor shall proceed as originally planned and reconfigured office space. The Contractor shall also adhere to the following: (A) The Government will not be the receiving agent for the shipment of parts and material from sub-contracted manufactures. Contractor will coordinate delivery to staging area of his/her choice and hold until installation schedule has been coordinated and accepted by the Government. (B) For Government Furnished Parts the Contractor shall remove from Government designated storage facility and transport to areas of installation. (C) Order material for job. (D) Receive/stage material and pre-assemble to the greatest extent possible until day of installation. (E) Contractor will coordinate installation date with the Government Point of Contact (POC). (F) Upon completion Contractor will remove any/all furniture parts not used. All workstations/furniture assemblies shall be fully functional. (G) Government POC will provide Contractor with escorts when necessary. (H) Assembly shall take place Friday at close of business (COB), Saturday and Sunday for furniture designated to go into modular. Otherwise installation can be conducted during regular work hours Monday-Friday 0730-1530. For solicitation package please call Kelly Snyder at 303-677-6440 or Fax request to 303-677-6443. (0132)

Loren Data Corp. http://www.ld.com (SYN# 0385 19980515\71-0001.SOL)


71 - Furniture Index Page