Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 1,1998 PSA#2086

Bi-State Development Agency, 707 North First Street, St Louis, Missouri 63102

Y -- TRACTION POWER SOL ML-97-SB-2325 DUE 071698 POC Sandra Armstrong, (314) 982-1400 ext. 1329 The Bi-State Development Agency (Agency) is soliciting bids for Traction Power for the St. Clair County Illinois MetroLink Extension project. The Disadvantaged Business Enterprise (DBE) participation goal is 16%. DBE firms are invited to propose directly or with another firm. This is a system-wide contract, where the work involves installation of eleven (11) traction power substations, the overhead catenary, and the required interfaces to the outside utilities. The Contract also includes installation of all other traction power requirements in the storage yard portion of the Illinois Maintenance Facility. The traction power substations are rated at 1.5MW. The substation units are required to be completely factory assembled and ready for connection to the utility interface, prior to shipment, on the concrete pad provided by this contractor. The overhead catenary system includes the overhead distribution subsystem, the physical support system, and disconnect switches for 17.4 miles of the double-track mainline and 1.6 miles of single-track yard tracks. Pre Bid Conference: 6/1/98 Bid Opening: 7/16/98 Copies of the Project Manuals and Drawings may be obtained by appointment only beginning May 18, 1998, Monday -- Friday between the hours of 8 a.m. thru 12 p.m. and 1 p.m. through 5 p.m. at the MertroLink Document Control Department by calling Ms. Sandra Armstrong at (314) 982-1400 ext. 1329. THE COST FOR A SET OF PLANS AND CONTRACT DOCUMENTS IS $325.00. THIS IS NON-REFUNDABLE. Each request must be accompanied by either a certified check, money order, or cashiers check payable to BI-State Development Agency. Written requests including arrangements for pick-up of plans and documents should be addressed to Ms. Sandra Armstrong, MetroLink, 2nd Floor, 707 N. First Street, St. Louis, MO 63102. Shipping costs are the responsibility of the requestor. Therefore, all requestors desiring to have a set(s) of plans and documents mailed are required to provide Ms. Armstrong with a Federal Express, UPS, etc. account number. Mailed-in requests will be returned, if this information is not provided. Anticpated St. Clair County MetroLink Extension Construction Procurement Schedule: ML-97-SB2326, Maintenance Facility, IL -- June 1, 1998 ML-97-SB2327, Signals -- July 6, 1998 ML-97-SB-2328, Communications -- August 3, 1998 ML-97-SB2329, Station Finishes -- July 6, 1998 (0119)

Loren Data Corp. http://www.ld.com (SYN# 0103 19980501\Y-0012.SOL)


Y - Construction of Structures and Facilities Index Page