|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 27,1998 PSA#2082U.S. Nuclear Regulatory Commission, Division of Contracts, Attn: Linda
Wise MS-T-7I2, Washington, D.C. 20555 R -- CHERNOBYL 3 SIMULATION LOAD FOR EXISTING ANALYTICAL SIMULATOR SOL
NRC-26-96-265 MOD 9 POC Mary H. Mace, Contracting Officer,
301/415/7314/ Stephen Pool Contract Negotiator 17. The Nuclear
Regulatory Commission (NRC) intends to negotiate a contract
modification to contract NRC-26-96-265 on a sole source basis with GSE
Power Systems, Inc. to purchase a Chernobyl 3 nuclear power plant
(NPP) simulation software load for installation on an analytical
simulator purchased by the NRC from GSE for the Ministry of
Environmental Protection and Nuclear Safety (MEPNS) of Ukraine. This
software load is to be developed with GSE proprietary software modeling
tools used to develop the MEPNS analtyical simulator and an analytical
simulator for Chernobyl 3 NPP personnel in 1997. The required period
of performance is 6 months. See numbered Note 22.***** (0113) Loren Data Corp. http://www.ld.com (SYN# 0082 19980427\R-0013.SOL)
R - Professional, Administrative and Management Support Services Index Page
|
|