COMMERCE BUSINESS DAILY ISSUE OF APRIL 23,1998 PSA#2080DA, Tulsa District, U.S. Army Corps of Engineers, P.O. Box 61, Tulsa,
OK 74121-0061 C -- DESIGN OF THE FIRE STATION AT MCALESTER ARMY AMMUNITION PLANT,
OKLAHOMA SOL DACA56-98-R-0014 POC Technical Manager: Ms. Joanne
Hensley, 918-669-7500; AE Contract Negotiator: Brad Hull, 918-669-7038
CONTRACT INFORMATION: A firm fixed price contract will be negotiated
for Architect-Engineer Services to provide the design for the subject
project. Required services consist of all work related to the
preparation of plans, specifications, construction cost estimates,
studies, and permit applications. Construction support services include
shop drawing reviews, field consultation, design modifications,
operation and maintenance manuals, and as-built drawing preparation may
be awarded as an option. This announcement is open to all businesses
regardless of size. If a large business is selected for this contract,
it must comply with FAR 52.219-9 regarding the requirement for a
subcontracting plan on that part of the work it intends to subcontract.
The subcontracting goals for the Tulsa District are : (1) at least 65%
of a contractor's intended subcontract amount be placed with small
businesses, (2) 10% to small disadvantaged businesses (SDB) and (3) 5%
to women! -- -owned small businesses (WOSB). Th e plan is not required
with this submittal. The anticipated contract award date is July 1998.
All responders are advised that this requirement may be cancelled or
revised at any time during the solicitation, evaluation, selection, and
negotiation, final award date may vary and final completion date may
vary. 2. PROJECT INFORMATION: This project consists of a modified
standard design fire station building. The 10,800 SF building will have
provisions for a 24 hours/day, 365 days/year manned site, to include a
kitchen facility, restrooms, 16 sleeping quarters, a radio
communications area, automatic data processing capability, exercise
area, general living room area, and four stalls 80 ft long to
accomodate the fire trucks and other required vehicles, including
storage areas for associated equipment. Supporting facilities include
utilities, lighting, parking lot and site improvements. Estimated
construction cost is between $1M and $5M. Metric scale is required on
! construction drawings. Selected A- E will be required to produce CADD
drawings compatible with Micro station software (5.0 or higher) of
Bentley Systems, access a Computerized Automated Review Management
Systems (ARMS) via modem, and produce cost estimates using the Corps of
Engineers Micro Computer Aided Cost Estimating Gold 3 (MCACES)
software. The content of the submittals as well as level of completion
required at various design stages are indicated in the Southwestern
Division Architectural and Engineering Instructional M anual
(SWD-AEIM), dated August 1996. Specifications (Divisions 1 thru 16)
shall be prepared in accordance with the Tulsa District Corps of
Engineers Specifications instructions. Directions provided in Chapter
VII-SPECIFICATIONS of the SWD-AEIM shall not apply. Instructions for
preparation of specifications as provided on the Tulsa District home
page.(http.//swt.usace.army.mil/). Specifications shall be prepared
using the SPECSINTACT automated specification system. Further i!
nformation regarding the home page and the! specifications may be
obtained by calling Tulsa District Specifications Section
(918)669-7030. The contractor shall provide at 100% design phase the
electronic bid documents of the design. 3. SELECTION CRITERIA: See Note
24 for general selection process. The selection criteria in descending
order of importance are: A. Past performance on DOD and other
contracts with respect to cost control, quality of work, compliance
with delivery schedules, history of working relationships with
consultants, timely construction support, and overall cooperativeness
and responsiveness B. Specialized Experience 1. Specialized recent
experience and technical competence of the A-E firm and/or consultants,
in the planning and design of facilities similar to fire stations that
have large open bays and sleeping quarters 2. Experience in the
planning and design of facilities to Army design criteria. 3. Designing
within cost limitations. 4. Design Quality management procedures! --
-coordination between disciplines and subcontractors. 5. ! Knowledge of
locality. Comparable experience of the firm and consultants on projects
completed within the last five years will be given the greatest weight.
C. Qualified registered professional personnel with experience in the
following disciplines: project management, architecture, electrical,
mechanical, fire protection, civil, structural, cost estimating,
environmental, geotechnical, and surveying. Particular focus will be on
the qualifications of the personnel with relevant experience on similar
projects proposed to do the work. D. Sufficient capacity to complete
the design by April 1999 with emphasis on the staff to be assigned to
the project. E. Volume of DOD contract awards in the last 12 months as
described in Note 24. F. Geographic locations and knowledge of
probable site locality and conditions, materials and supplies
availability and applicable regulatory requirements. 4. Submission
Requirements: Responding firms must also provi! de the names and
telephone numbers of clients as references in their three most recent
facility designs. See Note 24 for general submission requirements.
Interested firms having the capabilities to perform this work must
submit one copy of SF 255 and one copy of SF 254 for the prime firm and
all consultants, to the above address not later than the close of
business on the 30th day after the date of this announcement. If the
30th day is a Saturday, Sunday, or Federal holiday, the deadline is the
close of business of the next business day. Include the firm's ACASS
number in SF 255, Block 3b. For ACASS information, call 503-326-3459.
In SF 255, Block 10 please describe the firm's overall design quality
management plan. A project-specific design quality control plan must be
prepared and approved by the Government as a condition of contract
award, but is not required with this submission. Solicitation packages
are not provided. This is not a request for proposal. (0111) Loren Data Corp. http://www.ld.com (SYN# 0025 19980423\C-0009.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|