COMMERCE BUSINESS DAILY ISSUE OF APRIL 1,1998 PSA#2064U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street,
Omaha, NE 68102-4978 Y -- DOWNSTREAM EROSION REPAIR, GAVINS POINT DAM, SOUTH DAKOTA SOL
DACW45-98-B-0042 DUE 051298 POC Contract Specialist: Barbara Rennert,
402-221-4114 WEB: Omaha District Contracting Division Homepage,
http://ebs.nwo.army.mil/EBS/CONTRACT.HTM. E-MAIL: Barbara Rennert,
Barbara.J.Rennert@usace.army.mil. On or about 12 April 1998, this
office will issue Invitation for Bids for the construction of
DOWNSTREAM EROSION REPAIR, GAVINS POINT DAM, SD. Bids will be opened on
or about 12 May 1998. This solicitation is unrestricted and open to
both large and small business participation. Contractors interested in
inspecting the site of the proposed work should contact the Project
Manager's Office, Gavins Point Project, U.S. Army Corps of Engineers,
P.O. Box 710, Yankton, South Dakota 57078-0710, Telephone (402)
667-7875/7873. FAX (402) 667-8536/9919 The work will include the
following: (Approx. quantities) Project consists of placing
approximately 12,500 tons of Riprap material, 2,400 tons of Choker
material and the reseeding of disturbed areas. The estimated
construction cost of this project is between $250,000 and $500,000.
Contractor's Quality Control will be a requirement in this contract.
Large business concerns submitting bids for services exceeding $500,000
or for construction exceeding $1,000,000, shall comply with Federal
Acquisition Regulation 52.219-9 regarding the requirement for a
subcontracting plan. The U.S. Army Corps of Engineers considers the
following goals reasonable and achievable for fiscal year 1998: (a)
Small Business: 61.2% of planned subcontracting dollars. (b) Small
Disadvantaged Business: 9.1% of planned subcontracting dollars.
(c)Women Owned Small Business: 4.5% of planned subcontracting dollars.
The Contractor will be required to commence work within 10 days after
notice to proceed and complete the work 120 calendar days after
receipt of Notice to Proceed. Provisions will be included for
liquidated damages in case of failure to complete the work in the time
allowed. Performance and payment bonds will be required. Plans and
Specifications will be provided free of charge. All requests for
solicitation packages should be made in writing and no later than 14
days prior to bid opening. After such time, packages will be furnished
if supply is available. It has been determined that the number of sets
be limited to one (1) per firm. Ordering of plans and specifications
shall be by written request or register on the Omaha District website:
http://ebs.mro.usace.army.mil/EBS/Contract.htm or faxed to (402)
221-4530 with the following information: 1)Name of Firm; 2) Point of
Contact; 3) Mailing Address; 4) Street Address for Parcel Delivery
Service; 5)Telephone and Fax Phone Numbers with Area Code (FAX numbers
are mandatory to ensure the receipt of any amendments that may be
faxed); 6) Level of Participation (General Contractor, Subcontractor,
Supplier or Plan Room); and 7) Large Business, Small Business or Small
Disadvantaged Business. If any of the information changes during the
advertisement period, submit the information via e-mail to
Barbara.J.Rennert@usace.army.mil or by written request or fax. Failure
to provide the above information and any changes may cause a delay in
receiving plans, specifications and amendments. Questions regarding
the ordering of same should be made to: 402-221-4962. Telephone calls
regarding Small Business matters should be made to: 402-221-4110.
Telephone calls on contents of drawings and specifications should be
made to Specification Section at: (402) 221-4413. (0089) Loren Data Corp. http://www.ld.com (SYN# 0110 19980401\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|