|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 20,1998 PSA#2036U.S. Department of Labor, ETA, Division of Acquisition & Assistance,
200 Constitution Ave., NW, Room S-4203, Washington, DC 20210 Z -- PY '92/93/95 -- MISCELLANEOUS UPGRADES AT THE SIERRA NEVADA JOB
CORPS CENTER IN RENO, WASHOE, NEVADA SOL IFB-98-DAA-12-JC DUE 040698
POC Contact: Mr. John Walsh at (702) 356-1191 or Ms. Gwen Fox at (202)
219-8706 ext. 124 WEB: IFB-98-DAA-12-JC, http://cbdnet.access.
gpo.gov. E-MAIL: IFB-98-DAA-12-JC, foxg@doleta.gov. The work to be
performed under this project involves the asbestos abatement and
upgrading of plumbing systems and toilet fixtures in Buildings Nos. 1,
28 and 32; the replacement of hot water boilers in Dormitory Buildings
Nos. 11, 15, 18, 19, 20 and 21; the upgrading of the electrical system
in Building No. 18; and the installation of a make up air unit for the
kitchen hood exhaust system in Building No. 22 at the Sierra Nevada Job
Corps Center. The site is a 100 acre parcel of land located on the
former Stead Air Force Base, in Reno, Nevada. The center provides
academic, vocational, medical/dental, recreational, storage/support and
housing facilities. The estimated construction cost range is $100,000
to $500,000. The estimated completion time is 224 calendar days. Plans
and specifications will be available on March 2, 1998, from the Office
of The Moore Collaborative, 948 Victorian Avenue, Sparks, Nevada 89431,
contact Mr. John Walsh (702) 356-1191 for additional information
regarding this project. Collect calls will not be accepted. It is
emphasized that requests for plans and specifications shall be directed
to the A/E firm listed above to ensure proper handling of requests.
Requests must be in writing and a $50.00 refundable bid-deposit is
required. This bid-deposit must be in the form of a certified check,
cashier's check, or money-order, made payable to the U.S. Department of
Labor, and submitted to the A/E firm at the time of request. Requests
will be answered on a first-come, first-serve basis until supplies are
exhausted. For requests made after the supply is exhausted, the
Contracting Officer may determine whether payment of a fee is
warranted. The non-refundable fee shall not exceed the actual cost of
duplication of the IFB documents, plus COD charges. A Pre-Bid walk-thru
is scheduled for March 24, 1998, at 10:00 a.m., local time. Bid-opening
is April 6, 1998, at 10:00 a.m., local time. This is a 100% Small
Business Set-Aside acquisition. The Standard Industrial Classification
Code (SIC) is 1711.The size standard is $7.0 million. See Numbered
Note(s): 1. (0048) Loren Data Corp. http://www.ld.com (SYN# 0132 19980220\Z-0006.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|