COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 9,1998 PSA#2028SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187 Y -- P-902, MARINE CORPS RESERVE CENTER, NAVAL WEAPONS CENTER, SEAL
BEACH, CA SOL N68711-97-B-8232 DUE 031998 POC Donald Wiles/Contract
Specialist, (619) 532-3709, Dorothy LeStage/Contracting Officer, (619)
532-1301 MODIFICATION -- Correct the originally published synopsis
dated 2 February 1998, Submission No. 164087, to read the following:
"This is a public bid opening." The remainder of the synopsis and the
original bid opening date of 19 March 1998 remains unchanged.
DESCRIPTION OF WORK -- The Marine Corps Reserve Center will include the
following functions: Classrooms, administrative, drill hall, medical
annex, communication shop, vehicle maintenance shop, warehouse, motor
pool with wash rack and locker rooms. Over an acre will be under roof
and all the structures are one story. Site improvements will entail
about ten acres. Site work includes utilities, landscaping, irrigation,
asphalt paving, and oil water separators. Expansive soils will be
overexcavated and a poured in place concrete foundation will be used.
The structural system will consist of load bearing concrete masonry
units for most of the facility with structural steel for tall volumes.
The roof assembly will be comprised of steel joists withmetal decks
covered with rigid insulation and built up roofing. Exterior finishes
will consist of various exposed textured CMU as well as portions of
plaster. Interior finishes will include: gypsum board, tile, acoustical
ceilings, resilient sheet flooring, carpet, painting and coating.
Specialites will include: toilet partitions and accessories, louvers,
flagpoles, signage, lockers, fire extinguishers and cabinets, wire mesh
partitions, and operable partitions. Equipment will include: vault
doors, projection screens, dock levelers, package lift station, and
blinds. Special construction will include: asbestos containing
materials, fire alarm and sprinkler systems. Conveying systems include
an overhead crane. HVAC will be Unitary air conditioning equipment.
Electrical will include distribution, lighting, power, telephone and
LAN. Contractors should be aware that the Naval Weapons Center has a
very high level of security. Excavation into non-fill soils will be
observed by a Native American Monitor for potential artifact
discoveries. -- This is a public bid opening. -- The estimated cost is
$5 million and $10,000,000.00. -- Firm Fixed Price Contract. --
Contract duration is approximately 365 calendar days. -- Proposals will
be considered from all responsible sources. -- This project is
unrestricted. -- The Standard Industrial Code is 1541 and the annual
size is $17 million. It is recommended the subcontracting goals reflect
a minimum goal of 5% for Small Disadvantaged Business Subcontracting
effort. Bidders should request in writing stating IFB number
N68711-97-B-8232, with complete name, address, area code and phone
number and whether bidding as a prime/subcontractor/supplier. --
Telephone requests will not be accepted. -- There will be a charge of
$120.00 for each set of Specifications and Plans. -- The Plan and Issue
personnel will only accept Visa/Master card, cashiers checks and money
orders as payment for plans and specs. -- Mail requests with a money
order payable to DEFENSEPRINTING SERVICE to Southwest Division, Naval
Facilities Engineering Command (Plan Issue), 1220 Pacific Highway,
Bldg. 132, San Diego, CA 92132-5187 or fax requests to (619) 532-2083.
-- Fax requests will not be accepted but, WILL NOT be processed until
your payment has been received by this office. -- Submit one (1) check
per project. -- Solicitation packages are limited to two (2) sets per
prime and one (1) set per subcontractor/supplier. -- Bidders responding
under this advertisement will not be required to resubmit request once
formally advertised. -- Tentative issue date is on or about 17
February 1998 with an opening date of approximately 30 days later
(NOTE: BOD stated above is TENTATIVE). -- Responses are due no later
than 15 calendar days after publication of the advertisement in the
CBD. (0036) Loren Data Corp. http://www.ld.com (SYN# 0119 19980209\Y-0011.SOL)