Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 9,1998 PSA#2028

SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187

Y -- P-902, MARINE CORPS RESERVE CENTER, NAVAL WEAPONS CENTER, SEAL BEACH, CA SOL N68711-97-B-8232 DUE 031998 POC Donald Wiles/Contract Specialist, (619) 532-3709, Dorothy LeStage/Contracting Officer, (619) 532-1301 MODIFICATION -- Correct the originally published synopsis dated 2 February 1998, Submission No. 164087, to read the following: "This is a public bid opening." The remainder of the synopsis and the original bid opening date of 19 March 1998 remains unchanged. DESCRIPTION OF WORK -- The Marine Corps Reserve Center will include the following functions: Classrooms, administrative, drill hall, medical annex, communication shop, vehicle maintenance shop, warehouse, motor pool with wash rack and locker rooms. Over an acre will be under roof and all the structures are one story. Site improvements will entail about ten acres. Site work includes utilities, landscaping, irrigation, asphalt paving, and oil water separators. Expansive soils will be overexcavated and a poured in place concrete foundation will be used. The structural system will consist of load bearing concrete masonry units for most of the facility with structural steel for tall volumes. The roof assembly will be comprised of steel joists withmetal decks covered with rigid insulation and built up roofing. Exterior finishes will consist of various exposed textured CMU as well as portions of plaster. Interior finishes will include: gypsum board, tile, acoustical ceilings, resilient sheet flooring, carpet, painting and coating. Specialites will include: toilet partitions and accessories, louvers, flagpoles, signage, lockers, fire extinguishers and cabinets, wire mesh partitions, and operable partitions. Equipment will include: vault doors, projection screens, dock levelers, package lift station, and blinds. Special construction will include: asbestos containing materials, fire alarm and sprinkler systems. Conveying systems include an overhead crane. HVAC will be Unitary air conditioning equipment. Electrical will include distribution, lighting, power, telephone and LAN. Contractors should be aware that the Naval Weapons Center has a very high level of security. Excavation into non-fill soils will be observed by a Native American Monitor for potential artifact discoveries. -- This is a public bid opening. -- The estimated cost is $5 million and $10,000,000.00. -- Firm Fixed Price Contract. -- Contract duration is approximately 365 calendar days. -- Proposals will be considered from all responsible sources. -- This project is unrestricted. -- The Standard Industrial Code is 1541 and the annual size is $17 million. It is recommended the subcontracting goals reflect a minimum goal of 5% for Small Disadvantaged Business Subcontracting effort. Bidders should request in writing stating IFB number N68711-97-B-8232, with complete name, address, area code and phone number and whether bidding as a prime/subcontractor/supplier. -- Telephone requests will not be accepted. -- There will be a charge of $120.00 for each set of Specifications and Plans. -- The Plan and Issue personnel will only accept Visa/Master card, cashiers checks and money orders as payment for plans and specs. -- Mail requests with a money order payable to DEFENSEPRINTING SERVICE to Southwest Division, Naval Facilities Engineering Command (Plan Issue), 1220 Pacific Highway, Bldg. 132, San Diego, CA 92132-5187 or fax requests to (619) 532-2083. -- Fax requests will not be accepted but, WILL NOT be processed until your payment has been received by this office. -- Submit one (1) check per project. -- Solicitation packages are limited to two (2) sets per prime and one (1) set per subcontractor/supplier. -- Bidders responding under this advertisement will not be required to resubmit request once formally advertised. -- Tentative issue date is on or about 17 February 1998 with an opening date of approximately 30 days later (NOTE: BOD stated above is TENTATIVE). -- Responses are due no later than 15 calendar days after publication of the advertisement in the CBD. (0036)

Loren Data Corp. http://www.ld.com (SYN# 0119 19980209\Y-0011.SOL)


Y - Construction of Structures and Facilities Index Page