|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 24,1997 PSA#1978Regional Contracting Office, MARFORRES, 4400 Dauphine Street, New
Orleans, LA 70146-5400 D -- INSTALLATION OF VTC CABLE AND CONDUIT SOL M68479-98-Q-0024 DUE
120497 POC Sgt Dawn Piekutowski (504)678-5247 or Carol Register
(504)678-0348 This procurement is unrestricted; all responsible sources
may submit a quotation. This is a combined synopsis/solicitation for
commercial services prepared in accordance with the format in FAR
Subpart 12.6, as supplemented with additional information included in
this notice. This ammouncement constitutes the only solicitation;
quotes are being requested and a seperate written solicitatiion will
not be issued. Solictation number M68479-98-Q-0024 applies. The
standard industrial code is 7379, and the business size standard is 500
employees. This requirement is for a fixed price contract for one line
item as follows: Line item 0001: VTC cable and conduit installation in
bldg. 601, 4th floor in accordance with the following statement of
work: 1.0 Introduction / Identification Work is to be accomplished for
Marine Forces Reserve (MARFORRES). Marine Forces Reserve 4400 Dauphine
Street New Orleans, La 70146 1.1 Mission One of the missions of the
Marine Corps is to prepare for wartime expansion which mayrequire the
activation of reserve forces when necessary. The Marine Forces Reserve
provides trained Marines to augment the Active Duty forces during a
time of crisis or need. 1.2 Scope The primary goal of this Statement of
Work (SOW) is to provide a secure structured conduit system
installation, 1" and 3" EMT conduit, for the Marine Forces Reserve
(MARFORRES) Video Teleconferencing (VTC) project areas. This project
consists of work spaces in Building 601 at the Herbert Complex, East
Bank Facility, specifically rooms 4A409, 4A414, 4B105, 4B120 and 4B129.
MARFORRES headquarters is relocating from Building 603 into Building
601 and current occupants will remain in building 603 until scheduled
moves occur. Premise structure VTC conduit was not included in the
current renovation project for Bldg 601 nor was it previously planned
for in the current operational spaces in Bldg 603. 1.3 Background Due
to system relocation and cost effective efforts, the Marine Forces
Reserve will install 1" and 3" EMT conduit andhardware for a secure
capable VTC system. 2.0 Technical Environment The system environment
consists of a category five cabling system to the desktop. The focus
will be on installing a structured wiring system in conduit, capable of
supporting 100MB data transmission and structured wiring capable of
supporting secure data transmission with cabling from a centralized
location to specified work areas throughout the building. 2.1 Statement
of Work Design The contractor shall conduct a final site survey of the
work area's to determine specific cable runs and termination points.
The contractor shall document the results of the site survey and
include drawings (floor plans). The documentation and drawings will
include the projected locations for contractor installed cable runs
(vertical and horizontal) with applicable pair count and VTC station
outlets. Procurement The contractor will procure all
equipment/materials required by this task and ensure that these items
are delivered to the site. The equipment tobe purchased includes 3" and
1" conduit, termination hardware, communications/electronics cabling.
The contractor shall procure sufficient quantities of equipment to meet
the number of cable runs and termination's required. Installation The
contractor will perform these tasks at the site. The client
representative or the designated on-site contact will provide the
contractor with the locations of the wire closet and VTC station
outlets where the wire and termination equipment is to be installed. An
estimate of the number of VTC station outlets will be given. Horizontal
Cabling The contractor shall procure and plenum category five cabling.
The cable shall be run above the drop ceiling in conduit. Workstations
The contractor shall use IMO's with dual category five jacks to
terminate the cable at the jacked wall plates. All outlets shall be
installed eighteen inches (18") off the floor. Vertical Cabling The
contractor shall procure and plenum category five cabling. Testing The
contractor will perform testing and certification. Once the
installation of cabling and termination hardware has been completed,
the contractor shall test and certify the cable runs and termination
hardware from end-to-end for data connectivity. The contractor shall
provide the results of the test and certification documentation to the
Client Representative. Documentation The contractor shall proved
as-built documentation upon completion of all installation and testing.
The documentation shall provide a brief network overview and detailed
description of the cable plant design, including the location of
outlets and any distribution frame hardware. The documentation shall
include drawings (floor plans) of cable plant and patch panel port
assignments tables. The documentation is only necessary for contractor
installed cable, equipment and systems specific to the task order. 3.0
Project Approach The contractor will perform the tasks identified in
this proposal and will work with the United States Marine Corps (USMC)
personnel to meet the goals of this project. The contractor will
identify the best technical approach for providing: * VTC cabling and
conduit The contractor will provide engineers with expertise in the
appropriate networking and information system disciplines. The
contractor will coordinate activities based on priorities set by the
G-6 Office and will interact with the appropriate G-6 personnel to
recommend the best technical solution. The contractors approach should
optimize the reuse of related products and services, providing the
benefit of contractor experience in related projects. The contractor
will involve G-6 Program Office personnel at every step of the process.
4.0 Task Description The contractor will install various hardware and
cabling components in Building 601, connecting the conference room
areas from 1 floor back to the G-6 or VTC area. Also in Building 601,
the contractor will install structured cabling with conduit from the
VTC area to the designated workspaces. A complete cabling diagram will
beprovided by the contractor. The installed cable system will consider
bandwidth requirements to each floor, operational effectiveness, and
durability. The termination equipment includes information management
outlets to be installed at the workstations and a patch panel to be
installed in the G-6 Area. The contractor will provide a end to end
cabling system including any cabinets, conduit, cables, connectors face
plates, and "as installed" documentation. 4.1 Concurrent Contractors
The contractor will be required to perform work alongside other
contractors working on the MARFORRES renovation project. 5.0 Level of
Effort The following provides the initial estimate for the level of
effort (in hours) for the tasks to be performed. Cable Installation
Survey 20 Hours 5 Drops Conduit Cable Installation 200 Hours Testing /
Documenting 8 Hours This estimate represents our best technical
judgment based on the information currently available. Tasks may
require more or less time, and the effect on costs are understood. All
work will be performed on an hourly time and material basis. Hardware
expenses directly charged. 5.1 Initial Cost Estimate None 6.0 Place of
Performance The contractor's team will be performing work at the
contractors office and at Building 601, 4th, Floor in the Hebert
complex 4400 Dauphine Street, New Orleans La. The time spent will be
determined by the G-6 VTC coordinator. 7.0 Schedule Work will commence
within 5 business days after receipt of Order (ARO). Work will be
scheduled and performed along with the MARFORRES renovation project
schedule according to completion of individual work sections having
their work spaces completed. 8.0 Assumptions * The G-6 Program Office
will provide all available documentation and access to appropriate
personnel and facilities including other contractors related to this
effort. * The G-6 program Office will provide facility support (e.g.
lab equipment, desk, chair, telephone) for the contractor, during the
work period at USMC facilities. * The contractor will provide a weekly
status report to the G-6 Program Office for the duration of this
effort. There will be joint meetings with the contractor, G-6 Program
Office and related parities to resolve outstanding issues, discuss
status of effort and coordination of work performed. 9.0 Points of
Contact Major James E. Hall Deputy AC/S G-6 Marine Forces Reserve 4400
Dauphine Street New Orleans, La 70146 (504) 678-4288 (voice) (504)
678-5774 (fax) EMAIL James_E_Hall@MARFORRES.USMC.MIL Capt Raquel L
Lyles Operations Officer Marine Forces Reserve 4400 Dauphine Street New
Orleans, La 70146 (504) 678-6013 (voice) (504) 678-5774 (fax) EMAIL
Raquel_L_Lyles@MARFORRES.USMC.MIL CWO3 Randy Watkins Telecommunications
Marine Forces Reserve 4400 Dauphine Street New Orleans, La 70146 (504)
678-6839 (voice) (504) 678-5774 (fax) EMAIL
Randall_Watkins@MARFORRES.USMC.MIL Delivery/Installation is requested
to be started within 30 days after the award of contract. The provision
at FAR 52.212-2, Instructions to Offerors -- Commercial Items applies.
Addendum to FAR 52.212-1: Paragraph (d), Product samples -- delete in
its entirety. Paragraph (g), Contract award (not applicable to
invitation for bids) -- Delete in its entirety, and substitute "Award.
The Government plans to award a single contract resulting from this
solicitation." Offerors are required to complete and include a copy of
the following provisions with their proposals: (1) FAR 52.212-3,
Offeror Representation and Certifications -- Commercial Items; (2)
DFARS 252.212-7000, Offeror Representation and Certifications --
Commercial Items; and (3) DFARS 252.225-7000, Buy American Act and
Balance of Payments Program Certificate. Clause 52.212-4, Contract
Terms and Conditions-Commercial Items, applies. Addendum to FAR
52.212-4: Paragraph (o) Warranty: Add "Additionally, the Government
will accept the contractors commercial warranty." Add the following
addendum clause: FAR 52.211-5, New Material. The clause at 52.212-5,
Contract Terms and Conditions Required to Implement Statutes or
Executive Orders -- Commercial Items applies with the following
applicable clauses for paragraph (b): FAR 52.203-6, Restrictions on
Subcontractor Sales to the Government; FAR 52.222-26, Equal
Opportunity; FAR 52.222-35, Affirmative Action for Special Disabled and
Vietnam Era Veterans: FAR 52.222-36, Affirmative Action forHandicapped
Workers; FAR 52.222-37, Employment Reports on Special Disabled
Veterans and Veterans of the Vietnam Era. DFARS 252.219-6, Notice of
Total Small Business Set-Aside is applicable. FAR 52.214-21,
Descriptive Literature is Applicable. Quotes must be received no later
than 2:00 pm, local time 04 December 1997. Quotes sent via the US
Postal Service should be mailed to the Regional Contracting Office,
Marine Forces Reserve, 4400 Dauphine Street, New Orleans, LA
70146-5400. Hand carried quotes must be delivered directly to and
placed in the bidders mailbox located outside room number 1B454 in
Building 601 at the above address. Direct deliveries of bids is only
possible during weekdays, excluding holidays, between the hours of 8:00
am and 4:00 pm. Facsimile proposals will not be accepted. Payment of
services can be made utilizing the Governmentwide Commercial Purchase
Card (VISA). (0324) Loren Data Corp. http://www.ld.com (SYN# 0024 19971124\D-0004.SOL)
D - Automatic Data Processing and Telecommunication Services Index Page
|
|