COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 24,1997 PSA#1958JACKSONVILLE DISTRICT OFFICE, U.S. ARMY CORPS OF ENGINEERS, P.O. BOX
4970, JACKSONVILLE, FL 32232-0019 C -- A-E SERVICES FOR WATER RESOURCES PLANNING AND ENGINEERING FOR
VARIOUS PROJECTS PRIMARILY WITHIN THE JACKSONVILLE DISTRICT SOL
DACW17-98-R-0004 DUE 112497 POC Contract Specialist Robert Mosteller
(904) 232-3739 (Site Code DACW17) This solicitation is unrestricted and
is open to all firms regardless of size. Up to two (2) Contracts may be
awarded from this solicitation. The contract will be an Indefinite
Quantity Contract for a period of one year from date of award, with an
option to extend for two additional two years. Work will be assigned
by negotiated task orders. This solicitation contains the same scope of
work for more than one contract. Criteria used in allocating delivery
orders among the contracts include performance and quality of
deliverables under current contracts, current capacity to accomplish
the order in the required time, uniquely specialized experience,
equitable distribution of the work among the contractors, and other
relevant factors. Maximum order limits are $1,000,000 for each contract
year and up to $1,000,000 per delivery order. The Government reserves
the right to exercise the contract option period before the expiration
of the base contract period or preceding option period, if the
contract amount for the base period or preceding option period has been
exhausted or nearly exhausted. All services will consist of
preparation, development, coordination, incorporation of comments, and
reproduction of studies, reports, or portions of reports, pertaining
to engineering of water resources and related projects. Task Orders
will consist of assignments related to flood control, navigation,
recreation, ecosystem restoration, shore protection, shoreline erosion,
water management, and other Corps of Engineers responsibilities.
Analyses shall include but not be limited to plan formulation and
design related to hydraulic, hydrologic, coastal processes, recreation,
environmental studies/planning, socio-economic studies, cultural
resource investigations and design alternatives. The Contractor shall
remain available for additional information that may be required
following review of reports/studies/plans. The availability of the
contractor once the deliverable is submitted for review is crucial to
final approval of the report in a timely manner. Resolution of review
comments may require that additional work be completed an/or clarified.
1. SPECIALIZED EXPERIENCE OF FIRM. Firms must clearly demonstrate
specialized experience and expertise in water resources project with
emphasis on flood control, coastal planning and engineering,
hydrological/hydraulic planning and engineering, investigative
capabilities, preparation of cost estimates using MCACES software, and
ability to develop designs using the metric system of measurement. 2.
SIZE AND EXPERTISE OF STAFF: Firm must include, but not be limited to,
either in-house or through association with qualified consultants, the
following U.S. registered personnel, if registration is applicable, as
follows: Water Resources Planner, Civil Engineer, Coastal Planner,
Regional Planner, Coastal Engineer, Hydraulic Engineer, Hydrologist,
Water Quality Specialist, Environmental Engineer, Geotechnical
Engineer, Landscape Architect, Geo-Hydrologist, Cost Engineer, Cost
Estimator, Engineering Technician, GIS/CADD Technician, CADD Draftsman,
Land Surveyor, Biologist, Regional Economist, Economist, Real Estate
Specialist, Real Estate Appraiser, Archeologist, Cultural/Archeological
Analyst, Social Analyst, Institutional Analyst, Outdoor Recreation
Specialist, and Typist and all necessary supervisory and administrative
personnel to prepare planning and/or contract bid documents. 3.
CAPACITY TO ACCOMPLISH THE WORK IN THE REQUIRED TIME: Firm must have
the capacity to commence work within fifteen days after receipt of
notification to proceed with a task order and accomplish it in
accordance with scheduled completion dates. 4. PAST PERFORMANCE: Past
performance on contracts with Government agencies and private industry
regarding quality, cost control, and timeliness of work will be
reviewed. Past DOD experience data available to the Government through
the A-E Contract Administration Support System (ACASS) will be
utilized for prior performance evaluation. 5. VOLUME OF PAST DOD
CONTRACT AWARDED TO FIRM: Work previously awarded to the firm by DOD
will be reviewed with the objective of effecting equitable distribution
of contracts among equally qualified firms. 6. GEOGRAPHIC LOCATION OF
FIRM TO THE WORKSITE: Location of the firm relative to the work
(considered the Jacksonville, Florida District Office) will be
considered provided there is an adequate number of qualified firms for
consideration. Those firms which meet the requirements described in
this announcement and wish to be considered, must submit one copy each
of SF254 and SF255 for the firm or joint-venture and an SF 254 for
each subcontractor. In block 4 of SF 255 list only the personnel for
the office to perform the work indicated in block 3B. Additional
personnel strengths, including consultants, should be indicated
parenthetically and their source clearly identified. In block 7G of the
SF 255, indicate specific project experience for key team members and
indicate the team member's role on each listed project (architect,
project manager, etc.). Submittalof supplemental attachments to SF 255
per evaluation factors 1-4 is strongly recommended. Submittal package
is to be received in this office at the address indicated below no
later than 4:00 p.m. Eastern Time on 24 Nov 97. Submittals received
after this date and time will not be considered. Unnecessarily
elaborate brochures or other presentations beyond those sufficient to
present a complete and effective response to this announcement are not
desired. Small and Small Disadvantaged firms are encouraged to
participate as Prime Contractors or as members of Joint-Ventures with
other Small Businesses and all interested firms are reminded that the
successful firm will be expected to place subcontracts to the maximum
practical extent with Small and Small Disadvantaged firms in accordance
with the provisions of Public Law 95-507. If a Large Business firm is
selected, a Small Business subcontracting plan will be required prior
to award. Response to this ad should be in writing only; telephone
calls and personal visits are discouraged. The required forms shall be
submitted to the following address: U.S. Army Corps of Engineers,
ATTN: CESAJ-EN-DC, 400 West Bay Street, Room 1044, Jacksonville, FL
32202-4412 or U.S. Army Corps of Engineers, ATTN: CESAJ-EN-DC, P.O. Box
4970, Jacksonville, FL 32232-0019. This is not a request for a
proposal. (0295) Loren Data Corp. http://www.ld.com (SYN# 0019 19971024\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|