Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 28,1997 PSA#1896

Operational Contracts Division, Construction Branch, AFDTC/PKOC, 205 West D Avenue, Suite 541, Eglin AFB FL 32542-6862

Z -- CONSTRUCT BERM/REMOVE TANKS & REPAIR ASPHALT PLANT SOL F08651-97-B-0030 DUE 091297 POC Carolyn B. Hudson, Contract Specialist, 850-882-5628, Ext 5273, Cicile A. Ramos, Contracting Officer Project title previously published 10 Dec 96 under same solicitation number as Correct Drainage, Asphalt Plant Area. Eglin AFB FL has a requirement to complete Construct Berm/Remove Tanks and Repair Asphalt Plant, Eglin AFB FL. Bid opening date of 12 September 1997 is only an estimated date. In general, work consists of furnishing all plant, labor, materials and equipment, and performing all operations in connection with removing the existing tank supports, installing new heated asphalt storage tank, hot oil piping and insulation of new and existing lines. The project includes 2 areas of work. Four each 30,000 gallon tanks partially filled with materials used in making asphalt are to be cleaned internally. The tanks cannot be cut for cleaning. Some of the material has been in the tanks and not used for up to approximately 12 years. The AC20 tank has been, and still is, in continuous use. The contents of the AC20 tank are to be transferred by the contractor to the new 15,000 gallon asphalt tank. The contractor must provide his own heat/materials to remove the contents of the 3 remaining tanks, and these contents will become the property of the contractor. The contractor will be responsible for the removal of the tank contents (3 each) and proper disposal of these contents off-base. After the tanks are cleaned, they are to be left in-place. The contractor will not be required to move the tanks. After the Government removes the tanks, the second area of work involves the demolition of a gravel and dirt road, demolition and removal of a concrete dike and tank supports (4 sets of saddles), and the construction of a shallow berm. This berm is to be seeded and watered, as is the area from which the dike and tank supports are removed. Performance period is 120 calendar days. Estimated dollar range is between $100,000 and $250,000. All responsible sources may submit a bid which shall be considered by the agency. Firms responding should indicate if they are a small business. Solicitation packages are available at a $20.00 charge. All requests must be submitted in writing. Make check/money order payable to DFAS-LI, DSSN 6671, and mail along with your written request to AFDTC/PKO, 205 W. D Avenue, Suite 541, Eglin AFB FL 32542-6862 No telephone requests for solicitation packages are acceptable. If still interested, prospective bidders responding to earlier synopsis need not respond to this synopsis. (0204)

Loren Data Corp. http://www.ld.com (SYN# 0217 19970728\Z-0032.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page