Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 18,1997 PSA#1890

Commanding Officer, Southern Division,Naval Facilities Engineering Command, 2155 Eagle Drive, P. O. Box 190010, North Charleston, SC 29419-9010

Z -- ROCKET ASSEMBLY BUILDING, NAS FT. WORTH, TX SOL N62467-95-B-0962 DUE 090497 POC Technical inquiries prior to bid opening MUST be submitted to the address listed above or FAXED to (803)820-5853 Attn: Barbara Green Code 0212BG. The Contracting Officer for this solicitation is L.R. Fisk SOLICITATION NOTICE: THE COST FOR EACH SET OF PLANS AND SPECIFICATIONS IS $65.00. Full size drawings are available at an additional cost. THE POINT OF CONTACT IS RONNIE MITCHUM AT 803/743-4040,Ext, 18. THIS CHARGE IS NON-REFUNDABLE. To obtain plans and specifications you may CHARGE your request to a CORPORATE VISA CREDIT CARD or make company check payable to US Treasury and send to the DEFENSE AUTOMATED PRINTING SERVICE, ATTN: RONNIE MITCHUM, P O BOX 71359, CHARLESTON, SC 29415 OR FOR DIRECT OR EXPRESS MAIL DELIVERY, ADDRESS YOUR REQUEST TO SUITE B 2825 AVENUE D. NORTH CHARLESTON, SC 29408-1802. Please indicate if you are a Prime Contractor, Subcontractor, Supplier, ETC. Please also include (1) A Point of Contact, (2) A Telephone Number, and (3) a FAX Number. If problems arise concerning your request, call RONNIE MITCHUM at 803/743-4040, Ext. 18. To obtain a plan holders list FAX your request to 803/743-3027. Plan Holders List will be mailed. Plan Holders List can be obtained from the Internet at http://206.74.23.6. For inquiries about BID OPENING DATE, NUMBER OF AMENDMENTS ISSUED, CONTACT SUSAN CLARK at (803) 820-5775. To obtain bid results, call (803) 820-5922 after 10:00 AM for a pre-recorded message that will be available the day after scheduled bid opening. The work includes demolition and removal of existing Metal Building No 3370 along with existing asphalt pavement, as required for new construction; relocation of existing light poles and fence. Rework existing and asphalt roads at Rocket Assembly/Receiving Building and Maintenance/Storage Building and incidental related work. Construct and provide an explosive staging pad to accommodate unloading and interim storage of 1.1 explosives. Provide a Catenary lighting protection system and a new road from existing taxiway to the explosive staging pad. Construct a new Rocket Assembly/Receiving Bldg. with a Receiving/Inspection Bay and Missile Shop, consisting of three concrete harden walls, a concrete harden dividing wall between Receiving/Inspection Bay and Missile Shop Bay. Provide a 2 ton monorail in each Bay. The Rocket Assembly/Receiving Bldg. is air conditioned, heated and ventilated. Due to the required construction for a harden building and the type of use of the bays, it was decided to leave the walls exposed concrete even in the R-Value of R-4 is less than desirable. The difference will be made up in the HVAC unit. The roof R-Value is R-11 min. consisting of 3/4 inch thick expanded perlite recovery board R-2.8 min., 1.4 inch polyisocyanurate board R-9. Perimeter walls and roof consist of poured-in-place concrete. Personal doors and frames are extra heavy duty hollow metal, provide rough in for security to doors. Overhead doors are motorized coiling doors. Roof construction to be modified bituminous membrane roofing over rigid insulation, on poured-in-place roof. Roof drains to scuppers into conductor heads and downspouts. Construct a new Maintenance/Storage Building with a Bomb Build-up Bay, 20 MM Storage Bay, Munitions Storage Bay, Office, Breakroom, Men and Women's Toilet and Tele/Elect. Room consisting of a reinforced CMU dividing wall between each Bay. Perimeter walls consist of concrete tilt-up panel system with parapets. Personal doors and frames are hollow metal. Provide rough in for security to doors. Overhead doors are motorized coiling doors. Roof construction to be modified bituminous membrane roofing over rigid insulation, metal deck and steel joist. Roof drains to scuppers into conductor heads and downspouts. The Maintenance/Storage Bay Building is heated and ventilated only in the following bays: Bomb Build-up, 20 MM Storage and five Munitions Storage. The Administration areas are air conditioned, heated and ventilated. Due to the type of use of the bays, it was decided to leave the walls exposed concrete even if the R-Value of R-6 is less than desirable. The roof R-Value is R-11 min. consisting of 3/4 inch thick expanded perlite recovery board R-2.8 min 1.4 inch polyisocyanurate board R-9. (0197)

Loren Data Corp. http://www.ld.com (SYN# 0256 19970718\Z-0079.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page