|
COMMERCE BUSINESS DAILY ISSUE OF JULY 7,1997 PSA#188156 Contracting Squadron, 14100 W Eagle Street, Luke AFB, AZ 85309-1217 Y -- CONSTRUCT CENTRAL CHILLED PLANT SOL F02604-97-R0013 POC SSgt Paul
Key This project covers the construction of a 4900 square foot Central
Chilled Water Plant Building, an underground thermal storage tank with
4000 ton-hours of cooling capacity, having an area of 5000 square feet
and a clear height of 20 feet to the bottom of any obstruction and
mechanical yard for the equipment needed to provide central chilled
water for the buildings listed on the drawings. Landscaping shall be
provided around the building to create a pleasing visual appearance
from the surrounding area. The central chilled water pumping system
shall be a primary/secondary type. The electrical system for the
central chilled plant building shall consist of 12,470 volt primary
feeder, pad mounted transformer and 2500 Ampere service entrance
section. Primary power for this facility shall be taken from an
existing pad mounted high voltage electrical switch. Gas supply
connection shall be provided to the building by the local utility,
Southwest Gas. This Contract shall include Contractor Quality Control
and Partnering. This is a Request for Proposal, a Technical Proposal
will be required. There will be a non-refundable $60.00 charge for
plans and specifications, full size and half size available, Payable
to: U.S. Treasurer. Issue of solicitation to be 11 Aug 97. (0183) Loren Data Corp. http://www.ld.com (SYN# 0116 19970707\Y-0013.SOL)
Y - Construction of Structures and Facilities Index Page
|
|