COMMERCE BUSINESS DAILY ISSUE OF JUNE 17,1997 PSA#1868USACE VICKSBURG DISTRICT, 4155 CLAY STREET, VICKSBURG MS 39180-3435 Y -- RED RIVER WATERWAY, MISSISSIPPI RIVER TO SHREVEPORT, LOUISIANA,
POOL 4 AND POOL 5 BOAT LAUNCHING FACILITIES, PHASE II SOL
DACW38-97-B-0050 DUE 080597 POC Contract Specialist MARY RAY (601)
631-5348 (Site Code CW38) The work provided for consists of furnishing
all plant, labor, material, and equipment and construction of three
concrete masonry restroom facilities for the Red River Waterway
(Shreveport, Bossier City and Coushatta), complete with fixtures,
concrete slab, formed in place roof, precast pilasters and parapet, and
all mechanical and electrical work and appurtenances, including
concrete sidewalks, sodding around the sidewalk area, and utility
connections. Issue date on or about 30 JUN 97; Bid Opening Date on or
about 05 AUG 97. Plans $14.00; Specifications, $7.00, Complete set:
$21.00. Estimated value of the proposed work is between $250,000.00 and
$500,000.00 (0164) Loren Data Corp. http://www.ld.com (SYN# 0118 19970617\Y-0011.SOL)