|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 4,1997 PSA#1859U. S. Agency for International Development (USAID) Mission to West Bank
& Gaza, Regional Contracting Office, c/o American Embassy C -- WATER RESOURCES PLANNING ENGINEER, USAID/WEST BANK AND GAZA SOL
WRPE, PSC DUE 071597 POC Contact Point: John A. May, Regional
Contracting Officer, USAID/West Bank & Gaza, Telephone 972-3-511-4848,
Fax 972-3-511-4888. c/o American Embassy, USAID/West Bank & Gaza, APO
AE 09830-0026. The United States Agency for International Development
Mission to West Bank & Gaza is soliciting expressions of interest from
qualified U.S. citizens to serve under a Personal Services Contract
(PSC) as a Senior Water Resources Planning Engineer, to serve as
project manager of the $46 million Water Resources Program. The PSC
Senior Water Resources Planning Engineer will be part of the USAID
staff and report directly to the AID Regional Contracting Officer. The
PSC shall provide technical assistance services to USAID in planning
and implementing the development of water resources in the West Bank
and Gaza. The specific areas of technical assistance include water
resource and facility planning and design, institutional development,
construction of major water supply and distribution facilities,
operations and maintenance (O&M) planning and management, planning and
development of wastewater treatment facilities, and training support.
The primary role of the contractor is to oversee specific activities
being undertaken by USAID in the water resources sector in the West
Bank and Gaza under the Water Resources Program, to ensure their timely
and effective implementation. The contractor shall also provide
technical guidance on all projects in USAID's Water Resources Strategic
Objective. In this assignment, the contractor shall regularly review
conditions in the sector and gauge the extent to which progress is
being achieved in implementing appropriate construction, operation,
maintenance and management activities of facilities placed in service.
This will involve close liaison with the prime contractor for the
majority of activities under the program, as well as with relevant
Palestinian Authority offices, such as the Palestinian Water Authority
(PWA) and the West Bank Water Department (WBWD). The PSC Senior Water
Resources Planning Engineer will be required to obtain medical and
security clearance. The benefits package includes moving expenses,
storage, housing, and other benefits per USAID regulations for an
overseas tour. Basic household furnishings, including major appliances,
will be provided by post or will be available in leased quarters to be
provided by post. Shipment of a POV may be authorized. The PSC Senior
Water Resources Planning Engineer must be a US citizen and must
possess a university degree in a technical field related to the water
sector and must have a minimum of 15 years of relevant experience.
Knowledge of USAID programming systems is desired. Excellent writing
and verbal communications as well as program analytic skills are
required. The successful candidate must have experience working in
difficult logistic environments and must be willing to travel within
West Bank & Gaza. Computer skills including familiarity with
Wordperfect for Windows, are required in the preparation of documents.
The individual must have cross cultural experience preferably in the
Middle East and must be able to work as part of a team. All interested
and qualified individuals should submit a letter of application, a
completed SF-171, and any additional resume or statement of experience
by July 15, 1997 to: AID Regional Contracting Officer, USAID West Bank
& Gaza, Unit 7228, Box 0026, APO AE 09830, or by fax to the AID
Regional Contracting Officer, USAID West Bank & Gaza, fax number
972-3-511-4888. Questions concerning this announcement should be
addressed to the AID Regional Contracting Officer, phone 972-3-511-4848
or by internet to: jmay@usaid.gov. Selection of the successful
candidate will be made by a USAID review panel which will utilize the
following evaluation criteria: Technical qualifications (educational
background) relevant professional and geographic experience. USAID
reserves the right to not award a contract to any applicant. Period of
Performance: The services of the Senior Water Resources Planning
Engineer will be tentatively required from Summer of 1997 for two
years, subject to availability of funds and to USAID maintaining a
presence in West Bank & Gaza, with the possibility of extensions.
(0153) Loren Data Corp. http://www.ld.com (SYN# 0023 19970604\C-0010.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|