COMMERCE BUSINESS DAILY ISSUE OF JUNE 3,1997 PSA#1858General Services Administration, PBS, Property Management-6PMT, 1500 E
Bannister, Kansas City, MO 64131-3088 Z -- GROUND, 2ND, 3RD, AND 4TH FLOOR RENOVATIONS SOL GS06P97GYC1007
DUE 072297 POC Patricia Blitgen, 816-823-2278 E-MAIL: Contract
Specialist, patricia.blitgen@gsa.gov. Pre-invitation for Bid Notice for
Ground, 2nd, 3rd and 4th Floor Renovation -- U.S. Courthouse, 123 East
Walnut, Des Moines, Iowa. Job PCN RIA96890. IFB o/a 06/17/97.
Estimated Cost Range: $1,000,000 -- $5,000,000. Time for completion 450
calendar days after receipt of Notice to Proceed. No document charge or
deposit required. Project involves: Selective demolition, furnish and
install carpet, vinyl and ceramic tile, masonry, concrete, structural
steel, windows, doors/frames, wall partitions, millwork, fire
sprinklers, fire alarm, light fixtures and acoustic ceiling systems.
Work includes: Painting, glazing, plumbing, HVAC repair/replacement,
miscellaneous electrical work, hydraulic elevator, prisoner detention
hardware and control systems, and asbestos abatement (contained in
vinyl floor tile and pipe lagging). Abatement of PCB filled fluorescent
lighting ballasts will be required. Work also includes: Option 1 --
Control Valves, Option 2 -- Cable Trays, Option 3 -- Lighting Retrofit,
Option 4 -- Asbestos Abatement Any contractor or subcontractor
performing asbestos or other hazardous material work shall satisfy
special responsibility and provide bodily injury liability insurance
coverage of at least $1,000,000 per occurrence. Such coverage must
encompass liabilities arising from work with hazardous materials
involved. The Government will not indemnify against such risk. Special
competency qualification information will be required for the
contractor/subcontractor performing the elevator work. (0149) Loren Data Corp. http://www.ld.com (SYN# 0141 19970603\Z-0004.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|