|
COMMERCE BUSINESS DAILY ISSUE OF MAY 27,1997 PSA#1853DOC; Mountain Administrative Support Center; Acquisition Management
Division; 325 Broadway MC3; Boulder, CO J -- BOILER REPAIRS & UPGRADES SOL NB361-701175DT POC Doris Turner,
Purchasing Agent, (303) 497-3872; FAX: (303) 497-3163 E-MAIL: NOAA;
MASC Acquisition Management, Joyce.J.Mills@noaa.gov. The National
Institute of Standards and Technology (NIST) requires the boilers at
the Boulder, CO site to be updated to meet local codes and modern
standards. All materials and labor shall be supplied by the contractor.
The main room has 4 units consisting of three 1950 vintage
International units: one was updated with an Industrial Combustion
Corporation I/C unit; another unit is a 1980s Kewanee. These boilers
gas vent lines shall be replaced to proper size as determined by code
standards. High steam limit (manual reset) low water cutoff (manual
reset) shall be upgraded or replaced. Boilers 1 and 2 control station
shall be updated with Nema 12 cabinet (industrial type) to match Number
4 boiler's cabinet, with proper operating equipment. Cabinet shall
include indicator lights for power on, pilot, main flame or flame
failure, low water, steam pressure to 12 psi. Cabinet shall have
Low/High fire indicator for Boilers 1 & 2. Number 2 boiler requires a
gas regulator valve. Main room boiler number 3 gasvalve actuators
(Honeywell) needs replacing with new gas valve with proof of closure.
Number 4 boiler requires a new valve actuator. Building 24 has two
boilers (Cleaver Brooks) each requiring new 2" gas shutoff plug valves;
#11 boiler requires a 2" gas actuator proof of closure valve. Building
3 boiler (Titusville) requires a gas regulator valve. Boiler numbers
1, 2, 4, 5 & 6, Buildings 21, 22 and 25 all require low water cutoff
(manual) reset, high steam or low water limits (manual) resets. Boilers
#1, 2, 3, 4, 6, 7, 10, and 11 shall be updated with Fireye E 100
controllers. All bases will accept the E 100's controllers. All boilers
shall be mechanically adjusted and analyzed (co2, nox, as specified in
local code standards) to its best operating efficiency. It is not the
intent of the Government to issue a separate solicitation for this
requirement. Interested sources proposing to supply these services and
items must submit a written qualification statement by fax, clearly
establishing capability to meet the above requirements within 15 days
of this synopsis. Faxed responses are acceptable and should be sent to
303-497-3163. Responses are required by June 6, 1997. See numbered
note: 1. (0141) Loren Data Corp. http://www.ld.com (SYN# 0069 19970527\J-0003.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|