|
COMMERCE BUSINESS DAILY ISSUE OF MAY 22,1997 PSA#1851DA, Tulsa District, Corps of Engineers, PO Box 61, Tulsa, OK
74121-0061 Y -- BRIDGE PROTECTION, ARKANSAS RIVER, RALSTON, OKLAHOMA SOL
DACW56-97-B-0025 DUE 071097 POC Diane Cianci, Contracting Division,
918-669-7270 Bank protection along the Arkansas River at Hwy 18W county
bridge. The work includes reshaping the bank and placing an 18-inch
riprap over filter cloth to protect the bank slope. Construction of a
2-foot high weir at the upstream end that extends perpendicular into
the river 25 feet from the toe of the slope. Provide replacement
habitat to include about 34 containerized trees to be planted.
Estimated cost range of this project is $100,000 to $250,000. An
advanced non-refundable fee of $6.00 is required for each set of
specifications with bound-in drawings. Make check payable to F&A
Officer, USAED, Tulsa, and mail to the attention of Contracting
Division. Payment must be received prior to issuance of plans and
specifications. Plans and specifications will be available on or about
11 June 1997. No phone calls to order please. All orders will be
mailed via first class mail. Requests for special handling (Fed-X,
etc.) will not be honored. (0140) Loren Data Corp. http://www.ld.com (SYN# 0135 19970522\Y-0027.SOL)
Y - Construction of Structures and Facilities Index Page
|
|