COMMERCE BUSINESS DAILY ISSUE OF APRIL 24,1997 PSA#1831U.S. Army Engineer District, Norfolk, Attn: CENAO-CT, 803 Front Street,
Norfolk, Virginia 23510-1096 C -- A-E SERVICES ARE REQUIRED FOR DESIGN AND PREPARATION OF PLANS AND
SPECIFICATIONS FOR DEFENSE COMMISSARY AGENCY ADMINISTRATION FACILITY
ADDITION, FORT LEE, VA POC Philip Pointon@757-441-7701 E-MAIL: JoAnn B
Carrier, jcarrier@cenad1.nad.usace.army.mil. CONTRACT INFORMATION: A-E
services are required for site investigation, planning, engineering
studies, concept design, final design (optional), and construction
phase services (optional) for the subject project. A firm-fixed price
contract will be negotiated and awarded. These services are procured in
accordance with PL 92-582 (Brooks A/E Act) and FAR Part 36. The
contract is anticipated to be awarded in Jul 97 and design completed by
Feb 98. This announcement is open to all businesses regardless of size.
If a large business is selected for this contract, it must comply with
FAR 52.219-9, regarding the requirement for a subcontracting plan. The
subcontracting goals for the Norfolk District, which will be considered
by the Contracting Officer, are that a minimum of 50% of a contractor's
intended subcontract amount be placed with a small business (SB),
including small disadvantaged businesses (SDB), and 5% be placed with
SDB. This procurement is classified under SIC Code 8711. The plan is
not required with this submission. The wages and benefits of service
employees (see FAR 22.10) performing under this contract must be a
least equal to those determined by the Department of Labor under the
Service Contract Act. PROJECT INFORMATION: The project consists of the
design of a 64,000 GSF, four (4) story administrative building
addition to include open office, private office, administrative support
areas, conference spaces, library, ADP room, storage, kitchen and
dining space. Supporting facilities include water, sewer, storm
drainage, natural gas, ventilation and air conditioning system, energy
efficient heating, energy efficient lighting, elevators, fire
detection and suppression, security system, parking, handicapped
access, information systems, communications, landscaping, pavement and
general site improvements. A project-specific design quality control
plan will be required, but not with this submission. The estimated
construction cost of this project is over $9,000,000. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance (first by
major criterion and then by each sub-criterion). Criteria a through f
are primary. Criteria g and h are secondary and will only be used as
"tie-breakers" among technically equal firms. a. SPECIALIZED EXPERIENCE
AND TECHNICAL COMPETENCE IN: (1) Demonstrated experience by the prime
firm and its consultants in the design of multi-story, administrative
facilities. (2) Demonstrated experience by key members of the project
team in the design of multi-story, administrative facilities. (3)
Demonstrated experience by proposed Interior Designer in interior
design, furniture layout, and furniture procurement package
development. (4) Project Team Management Plan (PTMP) including team
organization and proposed method of carrying out the work to meet
specific project requirements and schedule. (5) Demonstrated ability to
produce quality designs based on evaluation of a firm's Design Quality
Management Plan (DQMP). The evaluation will consider the management
approach, coordination of disciplines and subcontractors, quality
control procedures, and prior experience of the prime firm and any
significant contractors on similar projects. (6) Knowledge of design of
building envelopes and systems for energy efficiency. (7) Demonstrated
experience working with other A-E firms/organizations, including
Government. (8) Computer Resources -- firms must indicate in Block 10
of the SF 255 the following items: (a) accessibility to and/or
familiarity with the Construction Criteria Base (CCB) system. This
shall include as a minimum, the SPECSINTACT specification system, the
MCACES estimating system, and the ARMS review management system; (b)
demonstrated CADD capability with capacity to produce output files in
".DXF" or ".DWG" file format. CADD drawings will be required on 3-1/2
inch diskettes in Auto CADD Release 13 or higher; (c) access to a Hayes
compatible modem 9600 baud or better. b. PROFESSIONAL QUALIFICATIONS:
(1) Thedesign team must possess experienced, registered personnel in
MECHANICAL engineering; also in the ARCHITECTURAL discipline. (2) A
qualified INTERIOR DESIGNER shall be part of the design team. Qualified
means a degree in Architecture or Interior Design with demonstrated
experience in space planning, color and finish selection and furnishing
selection and specification. c. CAPACITY to accomplish the work in the
required time. Firms must demonstrate ability of the design team to
complete the project expeditiously. d. PAST PERFORMANCE on DOD and
other contracts: (1) ACASS evaluations (superior performance
evaluations on recently completed projects is advantageous); (2)
Letters of evaluation/recognition by other clients; (3) On-time
delivery of designs for DOD and similar projects. e. KNOWLEDGE OF THE
LOCALITY: As described in Note 24. f. GEOGRAPHIC PROXIMITY: Location of
the firm in the general geographic area of the Norfolk District, COE.
g. SB and SDB PARTICIPATION: Extent of participation of small
businesses, historically black colleges and universities, and minority
institutions in the proposed contract team, measured as a percentage
of the total estimated effort. h. EQUITABLE DISTRIBUTION OF A-E
CONTRACTS: Volume of DoD Contract Awards in the last 12 months.
Equitable distribution of contracts among qualified A-E firms,
including minority-owned firms, small business (SB) and small
disadvantaged business (SDB) participation and firms that have not had
prior DoD contracts Considerations may include: (1) ACASS retrievals;
(2) Current workload as listed in Block 9 of the SF 255; and (3)
Equitable distribution of work among A-E firms (including
minority-owned firms, small business (SB) and small disadvantaged
business (SDB) participation and firms that have not had prior DoD
contracts) will only be considered when used as a "tie-breaker."
SUBMISSION REQUIREMENTS: See Note 24 for general submission
requirements. All requirements of this announcement must be met for a
firm to be considered for selection. Interested firms having the
capabilities to perform this work must submit a single SF 255 (11/92
edition) for the design team and single copies of current SF 254
(11/92) for the prime firm and each consultant, to the above address
not later than the close of business on the 30th day after the date of
this announcement. For the purpose of this notice, day number one is
the day following the date of publication. If the 30th day is a
Saturday, Sunday, or Federal Holiday, the deadline is the close of
business of the next business day. The revised 11/92 edition of the
SF255 (NSN 7450-01-152-8074) and SF254 (NSN 7540-01-152-7073) is
required. Forms may be obtained through GPO at (202)512-0132. The SF
255 must also include the following: a. Firms with more than one office
-- (1) Block 4: distinguish, by discipline, between the number of
personnel in the office to perform the work and the total number of
personnel in the firm; (2) Block 7c: each key person's office location;
b. Block 3: prime firm's ACASS # and distance (in terms of POV driving
miles) from address of office to perform the work and the Norfolk
District. For ACASS information, call (503)326-3459; c. Block 7f:
registrations must include the year, discipline and State in which
registered; d. Block 8b: Include a descriptive project synopsis of
major items of work; e. Block 9. Indicate fee in terms of thousands of
dollars, not percentage of work completed. f. Block 10. An
organizational chart including all key elements of the design team
demonstrating the firm's understanding of and ability to execute
projects under the contract. Describe the firm's overall DQMP.
Submittals by facsimile transmission will not be accepted and will be
considered nonresponsive. THIS IS NOT A REQUEST FOR PROPOSAL.
SOLICITATION PACKAGES WILL NOT BE PROVIDED. (0112) Loren Data Corp. http://www.ld.com (SYN# 0017 19970424\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|