|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 14,1997 PSA#1823USDA-Natural Resource Conservation Service, 101 South Main Street,
Temple, Texas Y -- COOKS SLOUGH ADDED STRUCTURESFOR LEONA RIVER WATERSHED SOL
NRCS-07-TX-97 DUE 050897 POC Geoben A. Johnson, Contracting Officer
Construction of the following added work structures to Cooks Slough
Channel. Consists of one concrete chute, one grouted rock riprap chute,
one side inlet, one waterway, woven wire fence and non-cable side
inlet, one water side inlet, one Water Barriers. Work is located in
Cooks Slough Channel in the city of Uvalde, Uvalde county, Texas.
Estimated Price Range is $25,000.00 to $100,000.00. Site Visit:22 April
1997, 10 am., 1st State Bank, 200 Nopal, Uvalde, Texas. Bid Opening: 13
May 1997 at 3pm local time. (0100) Loren Data Corp. http://www.ld.com (SYN# 0120 19970414\Y-0022.SOL)
Y - Construction of Structures and Facilities Index Page
|
|