Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 11,1997 PSA#1822

Department of Transportation, Federal Aviation Admin. (FAA), Procurement Branch, AWP-55, P.O. BOX 92007, WWPC., Los Angeles, CA. 90009-2007

Y -- REPLACEMENT & INSTALLATION OF A 600 KW E/G AT SACRAMENTO ATCT, SACRAMENTO, CALIF. SOL DTFA08-97-B-10767 POC Cynthia Alatorre FAX (310) 536-8550 The Federal Aviation Administration (FAA) Western-Pacific Region has a requirement for the installation of a Government Furnished 100 KW Engine Generator and associated equipment at the Sacramento Metro Air Traffic Control Tower (ATCT), located at the Sacramento International Airport, Sacramento, California. The contractor shall provide all labor, equipment (except Government Furnished Materials), transportation and materials required to upgrade the existing essential power distribution system and replace the existing generator. Work shall include but is not limited to: providing reliable stand-by electrical power for the ATCT during all phases of the project, remove existing 60 KW engine generator set, control panel, isolation switch, essential power disconnect switch, load bank, starting battery and battery rack, coordinate the transportation and moving of all new Government Furnished material from the local Kohler distributor located in West Sacramento, California to the Sacramento ATCT, replace various existing power distribution panels, supply panels and install five power distribution panels, install Government furnished engine generator, automatic transfer/bypass switch, battery charger, day tank, load bank controls and remote radiator and complete system checkout and testing as specified by Kohler checkout and test procedures and all associated work. All work shall be in strict accordance with FAA plans and specifications. The period of performance is established for sixty (60) calendar days. The period of performance is mandatory and shall be performed within this time frame. The FAA currently has five (5) known sources that it intends to solicit for responses to this requirement. In addition to these known sources, the FAA will provide a solicitation to the first fifthteen (15) written requests responding to this announcement on a "first come" basis only. All interested parties must submit their written request in writing and may be FAXed to the attention of Cynthia Alatorre at FAX number (310) 536-8550 or e-mail to Cyndy.Alatorre@FAA.Dot.Gov. NO TELEPHONE REQUESTS WILL BE ACCEPTED. NOTE: Request for Offers (RFO) shall be issued to offerors that have met and fulfilled the pre-qualification criteria as required in a Screening Informaton Request (SIR) for this procurement request. An evaluation of potential bidders shall be performed and shall be based on the followoing factors: 1) Past Performance & References if similar work performed; 2) Financial Capacity; 3) Credit References; 4) Technical Expertise with a minimum of five (5) years direct responsibility for the installation of a 100 KW engine generator and associated equipment and, 5) Bonding Capacity up to $250,000. The Standard Industrial Classification (SIC) for this procurement is 1796 and includes an estimated price range of $50,000.00 to $100,000.00. An issue date for the Request for Offer DTFA08-97-B-10767 is currently scheduled for/or on about April 14, 1997, with responses due on or about May 9, 1997. (0099)

Loren Data Corp. http://www.ld.com (SYN# 0123 19970411\Y-0010.SOL)


Y - Construction of Structures and Facilities Index Page