COMMERCE BUSINESS DAILY ISSUE OF APRIL 7,1997 PSA#1818U.S. Department of the Interior, Office of Surface Mining Reclamation
and Enforcement, Three Parkway Center, Suite 300, Pittsburgh, PA 15220 C -- CARR RECLAMATION PROJECT, ST. CHARLES, SAGINAW COUNTY, MICHIGAN
POC Brian J. Luzik The Office of Surface Mining is soliciting services
to locate by ground survey methods and investigate the conditions of
the shafts which serviced five coal mines near the Village of St.
Charles, Saginaw County, Michigan. A/E services are required for
surveying, planning, and engineering studies. The contractor shall
research each mine shaft in order to determine the location of all
shafts. The shafts shall be located in the field by standard ground
survey techniques. Once located, the contractor shall conduct a
drilling investigation of the shafts to determine the condition of the
shaft lining, any caps or false bottoms, and the extent and condition
of any backfill material present in the shafts. If a shaft is judged
to be in an unstable condition by OSM, the contractor shall survey to
generate a site plan for the mine site. A final report shall be
prepared for each mine site. A detailed site plan shall be provided for
those sites requested by OSM> The project consists of five separate
mine sites located in and around the Village of St. Charles, Saginaw
County, Michigan. There are at least two shafts associated with each
mine site. Estimated Construction cost range -- $50,000 to $100,000.
Selection of the A/E firm will be based on the following factors which
are listed in relative order of importance: 1) Professional
qualifications necessary tor satisfactory performance of required
services: Experience and expertise in the discipline of surveying,
engineering analysis, and geotechnical investigation in the Saginaw
County area. The selected firm must have services of a reqistered
professional engineer and a licensed land surveyor. Resumes (block 7 of
the SF 255) must be submitted for these disciplines, including
consultants. In addition, resumes of all individuals which will be
directly involved with the project management shall be submitted. The
contractor must have the ability to provide drilling services either
directly or by subcontract. 2) Geographic location: The contractor
shall be rated as to their knowledge of the area, its terrain and the
types of recent projects in the area. The contractor shall provide the
location of the principal operating office and any other offices that
will be used to provide services for the work. 3) Specialized
experience and technical competence in the type of work required:
Experience with coal mining related problems in the Saginaw area. 4)
Past performance on contracts with Government agencies and private
industry in terms of cost control, quality of work, and compliance with
performance schedules. 5) Capacity to accomplish the work in the
required time. Firms must submit a copy of their SF254 and SF 255, and
a copy of each subcontractor's SF254 and SF255. These forms must be
received in the Office of Surface Mining, Three Parkway Center,
Pittsburgh, Pa 15220. no later than close of business on the 30th day
after the date of this notice in the Commerce Business Dailey. If the
30th day is a Saturday, Sunday, or Federal Holiday, the deadline is the
close of business ofthe next business day. In block 10 of the SF 255
provide the design management plan and organization chart for the
proposed team and the names and telephone numbers of clients as
referenced on recent land restoration or geotechnical projects. (0093) Loren Data Corp. http://www.ld.com (SYN# 0032 19970407\C-0007.SOL)