|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 3,1997 PSA#1816U.S. SPECIAL OPERATIONS COMMAND ATTN: AMSAT-D-TK 4300 GOODFELLOW W
BLVD. ST. LOUIS, MO 63120-1798 J -- OVERHAUL OF COMPONENTS ON THE MD-500 SERIES AIRCRAFT. SOL
USZA95-97-R-0017 DUE 042997 POC Point of Contact: Robert S. Blaine,
Phone: 314-263-0857, FAX: 314-263-1828 and E-mail:
bblaine@tapo1.tapo.stl.army.mil Contracting Officer: Richard J. Cooney,
Phone: 314-263-2279 E-MAIL: Robert S. Blaine/Contract Specialist,
bblaine@tapo1.tapo.stl.army.mil. THIS IS A COMBINED SYNOPSIS AND
SOLICITATION. OVERHAUL OF COMPONENTS ON THE MD-500 SERIES AIRCRAFT. SOL
USZA95-97-R-0017 DUE 042997 POC Point of Contact: Robert S. Blaine,
Contract Specialist, Phone: 314-263-0857, Fax: 314-263-1828, E-mail:
bblaine@tapo1.tapo.stl.army.mil Contracting Officer, Richard J. Cooney,
314-263-2279 E-MAIL: Robert S. Blaine, Contract,
bblaine@tapo1.tapo.stl.army.mil. Overhaul of components for McDonnell
Douglas Helicopter Systems (MDHS) MD-500 series helicopters. This
procurement is a 100% Small Business Set-Aside. All parts used in the
overhaul of these items must be new MDHS parts. All work must be
conducted in accordance with the MDHS service manual. The work must be
performed in accordance with all Federal Aviation Administration
Regulations. This procurement will be evaluated for multiple awards,
one award for each contract line item number (CLIN). The following
terms and conditions apply to all CLINs: Quantity, the quantity will be
identified on each delivery order. Inspection and Acceptance will be
Origin, the contractors facility. F.O.B. will be Destination, the
contractor will include the shipping costs in their proposed unit
price. The destination will be identified on each delivery order, the
normal delivery will be to: MSSA/CRP HHC 160th SOAR (ABN), Attn:
Property Book Officer, Bldg. 7262, Hangar 15, Ft. Campbell, KY
42223-5000. The tu rn around time for the items is 30 days after
receipt of the item by the contractor. Packing and Packaging will be
best commercial practice. The firm fixed price overhaul and the over
and above work shall not exceed 50% of thets procurement cost for the
item, this is the Maintenance Expenditure Limit (MEL). The MEL shall be
calculated as follows: 50% of the MDHS current catalog price. The
Economic Price Adjustment is limited to 10% of the offerd price over
the 3 yr. term of hte contract. CLIN 0001 Overhaul PN: 369H1800-501;
T/R Pitch Control 0001AA Firm Fixed Price Overhaul $__ __ __ &llmdash;_
each 0001AB Over and Above work(time and material) labor $__ ____ per
hour parts cost plus __ __ ___% CLIN 0002 Overhaul PN: 369H7010-501;
Unilock 0002AA Firm Fixed Price Overhaul $__ __ __ __ each 0002AB Over
and Above work(time and material) labor $__ ____ per hour parts cost
plus __ __ ___% CLIN 0003 Overhaul PN: 369A5350-41; Over Running Clutch
0003AA Firm Fixed Price Overhaul $__ __ __ __ each 0003AB Over and
Above work(time and material) labor $__ ____ per hour parts cost plus
__ __ ___% CLIN 0004 Overhaul PN: 369D26301-231, -251; L/G Damper
0004AA Firm Fixed Price Overhaul $__ __ __ __ each 0004AB Over and
Above work(time and material) labor $__ ____ per hour parts cost plus
__ __ ___% CLIN 0005 Overhaul PN: 369D24518-3, -5; N2 Indicator 0005AA
Firm Fixed Price Overhaul $__ __ __ __ each 0005AB Over and Above
work(time and material) labor $__ ____ per hour parts cost plus __ __
___% CLIN 0006 Overhaul PN: 369A4514-3; Engine Power Out 0006AA Firm
Fixed Price Overhaul $__ __ __ __ each 0006AB Over and Above work(time
and material) labor $__ ____ per hour parts cost plus __ __
_&llmdash;_% CLIN 0007 Overhaul PN: 369A4516-7; N1 Tachometer 0007AA
Firm Fixed Price Overhaul $__ __ __ __ each 0007AB Over and Above
work(time and material) labor $__ ____ per hour parts cost plus __ __
___% CLIN 0008 Overhaul PN: 369D21728; T/R Forks 0008AA Firm Fixed
Price Overhaul $__ __ __ __ each 0008AB Over and Above work(time and
material) labor $__ ____ per hour parts cost plus __ __ ___% CLIN 0009
Overhaul PN: 369D21800; T/R Pitch Control 0009AA Firm Fixed Price
Overhaul $__ __ __ __ each 0009AB Over and Above work(time and
material) labor $__ ____ per hourparts cost plus __ __ ___% CLIN 0010
Overhaul PN: 369d27611-503, M/R Swash Plate 0010AA Firm Fixed Price
Overhaul $__ __ __ __ each 0010AB Over and Above work(time and
material) labor $__ ____ per hour parts cost plus __ __ ___% CLIN 0011
Overhaul PN: 369D26300-251; L/G Damper 0011AA Firm Fixed Price
Overhaul $__ __ __ __ each 0011AB Over and Above work(time and
material) labor $__ ____ per hour parts cost plus __ __ ___% CLIN 0012
Overhaul PN: 369D28312; Oil Cooler 00121AA Firm Fixed Price Overhaul
$__ __ __ __ each 0012AB Over and Above work(time and material) labor
$__ ____ per hour parts cost plus __ __ ___% CLIN 0013 Overhaul PN:
369H6425-5; Dimmer Control 0013AA Firm Fixed Price Overhaul $__ __ __
__ each 0013AB Over and Above work(time and material) labor $__ ____
per hour parts cost plus __ __ ___% CLIN 0014 Overhaul PN: 369A4521-3,
-5, -7, -- - -9; TOT Indicator 0014AA Firm Fixed Price Overhaul $__ __
__ __ each 00`4AB Over and Above work(time and material) labor $__ ____
per hour parts cost plus __ __ ___% The following Provisions and
Clauses Apply: FAR 52.212-3, CONTRACTOR CERTIFICATIONS; FAR 52.212-4,
CONTRACT TERMS AND CONDITIONS -- COMMERCIAL ITEMS ( AUG 1996); FAR
52.212-5, CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES
OR EXECUTIVE ORDERS -- COMMERCIAL ITEMS (AUG 1996); FAR 52.211-5, NEW
MATERIALS (MAY 1995); FAR 52.216-4, ECONOMIC PRICE ADJUSTMENT -- LABOR
AND MATERIAL (APR 1984); FAR 52.216-18, ORDERING (OCT 1995); 52.216-21,
REQUIREMENT (OCT 1995); 52.219-6, NOTICE OF TOTAL SMALL BUSINESS
SET-ASIDE (JUL 1996); 52.245-2, GOVERNMENT PROPERTY(FIXED PRICE
CONTRACTS)(DEC 1989); DFARS 252.217-7028, OVER AND AABOVE WORK (DEC
1991) (0086) (0091) Loren Data Corp. http://www.ld.com (SYN# 0059 19970403\J-0011.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|