COMMERCE BUSINESS DAILY ISSUE OF MARCH 19,1997 PSA#1805Department of Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- SOIL REMEDIATION AT AREAS 11, 12, 18A, AND W, FORMER RARITAN
ARSENAL, EDISON, NEW JERSEY SOL DACA33-97-B-0008 DUE 052097 POC Jerry
Nunziato, 617-647-8424 E-MAIL: Contracting,
Jerome.F.Nunziato@USACE.Army.Mil. The work of this project consists of
the excavation, stockpiling, removal, transportation, and disposal of
12,200 CY of contaminated soil and 550 CY of contaminated debris
(including formerly used waste containers) from various locations
within the former Raritan Arsenal. Also included is the removal,
transportation, and disposal of two steel underground storage tanks and
three concrete underground storage tanks. Intact drums, requiring
overpacks, are anticipated. Related work includes backfilling the
excavations with uncontaminated materials from required excavations and
certified clean fill, compaction, erosion and sedimentation control,
surface water diversion, topsoiling and seeding, and bituminous
concrete paving. Estimated cost of the work is between $1,000,000.00
and $10,000,000.00. Work shall be completed within 270 calendar days.
Specifications available on or about 041497 at a cost of $15.00 per
set. The proposed contract listed here is a 100% small business
set-aside. All responsible sourcesmay submit a bid which will be
considered by the New England Division. (0076) Loren Data Corp. http://www.ld.com (SYN# 0138 19970319\Z-0021.SOL)