|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 14,1997 PSA#1783Regional Contracting Department, Fleet & Industrial Supply Center, Box
300, Pearl Harbor, HI 96860-5300 38 -- DUST COLLECTORS SOL N00604-97-R-0012 DUE 030697 POC Sandra
Nagayama, Contract Specialist, (808)474-2397, ext.223; CDR D.J. Graff,
Contracting Officer, (808) 474-2397, ext. 200. This solicitation is
unrestricted, all responsible sources may submit a proposal. This is a
combined synopsis/solicitation for commercial items prepared IAW the
format in FAR Subpart 12.6, as supplemented w/additional information
included in this notice. This announcement constitutes the only
solicitation, proposals are being requested & a separate written
solicitation will not be issued. Solicitation No. N00604-97-R-0012
applies & is issued as a Request for Proposal. This solicitation
document & incorporated provisions & clauses are those in effect
through Federal Acquisition Circular 90-45 & Defense Acquisition
Circular 91-11. The standard industrial code is 3564 & the business
size standard is 500 employees. This requirement is for a fixed priced
contract for two (2) line items. This spec covers eight (8) total
portable cartridge filter dust collectors, herein called DC, which
shall remove solid debris & dust particles from exhaust ventilation air
during sandblasting operations. Item 0001 = four (4) DCs as stated
below, Item 0002 = four (4) as stated below except for three changes
marked in [brackets]. DC shall be assembled & ready for use. Applicable
Documents -- Title 29 of the CFR, Chapter XVII, Part 1910 -- OSHA,
NEMA, NFPA 70, & NFPA 79. Materials not definitely specified shall be
IAW a fed, military or national technical society, association or
institute spec or std. DC shall: 1) have 9900 ft2 [13200 ft2] min
filter area, 2) be designed for 100 psig compressed air supply w/
1-1/4" NPT male fitting, 3) be furnished w/a compatible, self-relieving
air regulator w/gauge control, 4) have oil & water separator to filter
compressed air stream, 5) have momentary contact start & stop push
button station, applicable motor starter, & exterior supply circuit
disconnect (fusible disconnect or circuit breaker). Controls shall be
placed free of obstructions & easily accessible, 6) be designed to
withstand exposure to sun, wind (80 mph freestanding), rain,& salt
water, 7) have a min 40 hp [60 hp] TEFC industrial centrifugal backward
inclined blower, 8) have an automatic pneumatic pulse cleaning of
filter cartridges regulated by a solid state control panel. Pulse
frequency & duration to be adjustable, 9) have the capability to clean
the filter cartridges off-line (w/o pressure of the suction air
against the filters), 10) be capable of trapping min of 99.999% of
8-micron size particles, 11) be wired for 460 VAC, 60 Hz, 3 phase,
control voltage shall be derived from the control transformers
contained in the same unit, 12) be constructed of steel treadplate, no
aluminum or magnesium eqpt parts shall come in contact w/dust, 13)
permit personnel to easily service the eqpt using a minimal number of
tools, 14) provide access ladders w/elevated platform & railings for
personnel to do cartridge changeouts, & 15) have covers, guards, or
other safety devices for all parts of the eqpt that present safety
hazards & be removable to facilitate inspection,maintenance & repair of
the parts w/out interfering w/operation of the eqpt. DC blower shall be
rated for a min of 15,300 cfm at 11.65" [20,400 cfm at 13.25"] of water
static pressure, fan silencer shall be mounted at the fan's discharge,
DC shall have flanged inlet discharge type CW UBD, discharge area to
be equipped w/a screen cover to guard against large debris
entering/exiting the outlet, control panel shall be enclosed in a NEMA
4X enclosure, hopper discharge shall include connecting flex hose and
55 gal drum cover. Hopper must have clearance to discharge contents
into 55 gal drum situated on a standard pallet. All utility connections
shall be easily accessible from outside the frame on ground level &
shall include the applicable protection devices, i.e., circuit breakers
for electricity, oil & water separators for compressed air. Include: 1)
1 set of replacement filters for the oil & water separators for each
unit, 2) 1 set of flame retardant replacement filter cartridges for
each unit,3) if any fuses are used, 2 sets of replacement fuses for
each unit, & 4) eqpt required to operate/service the DC. Electrical
components including motors, starters, relays, switches, & wiring shall
conform & be located IAW applicable NEMA, ANSI, & NFPA standards
[Especially NFPA 70 (National Electrical Code) & NFPA 79]. The
electrical components shall also be UL (listed or recognized), FM
listed, or listed by an equivalent certified nationally recognized
testing organization. Provide a certification stating that the DC is in
compliance w/OSHA 29 CFR 1910.303(b). Copy of this cert is to be
included in the mfr's tech manual. Electrical system shall conform to
NEC & be capable of electrical lockout/tagout. Push button supply
circuit disconnect device, either a fusible motor circuit switch or
circuit breaker, provided & installed on the eqpt. Operating controls
shall be located convenient to the operator at his normal work station.
Exposed electrical components shall meet the reqmts of NEMA 4X. Exposed
instrumentation controls, electrical enclosures or electrical wiring
shall be waterproof. Audible noise emitted shall be 104 dBA or less
w/in a 2' radius around the entire eqpt & 84 dBA or less w/in a 20'
radius around the entire eqpt. DC shall not emit materials hazardous to
the ecological system as prescribed by fed, state or local statutes.
The use of asbestos, polychlorinated biphenyl (PCB) or mercury material
on/in DC are prohibited. Machine parts, components, mechanisms, &
assemblies on the unit shall comply w/specified reqmt of "OSHA Safety
& Health Standards (29 CFR 1910), General Industry" that are applicable
to the eqpt. Forklift channels, legs or some frame shall support the
eqpt off the ground. The gross weight of DC & its contents shall not
exceed 20,000 lbs & shall be permanently marked (empty & full, if
applicable) on the nameplate. Determination of weight certified &
documented in the tech manuals. DC shall have box section tine guide
openings in the base for safe handling & transport by a 20,000 capacity
forklift. Box sections extend through the entire width (i.e., the
shorter footprint dimension) of the eqpt completely enclosing the
forklift tines, fabricated from metal having a min thickness of 0.25",
have internal cross-sectional dimensions of at least 4" high by 10"
wide & welded to the base & so spaced apart (no greater than 34")
center to center. Contractor provided lugs or lifting eyes shall be IAW
all applicable OSHA reqmts. Certify that lifting lugs & padeyes
provided have a min factor of safety of 5 to 1 w/respect to ultimate
material strength. Access to the lugs or lifting eyes shall be provided
(e.g., ladders, if necessary). Lifting cables shall be free from
obstructions. DC surfaces clean & free of harmful/extraneous material.
All edges rounded or beveled. A corrosion-resistant metal nameplate
shall be securely attached to the machine's exterior at eye level.
Words, in English, shall be engraved, etched, embossed or stamped in
bold-faced letters containing the mfr's name, serial number, size,
model, power input (volts, amps, phase, frequency), gross weight of the
eqpt, contract number, date of mfr, & bar coding. Copy of the nameplate
shall be in the tech manuals. A partial assembly of the DC, if required
for shipping, is acceptable but shall be tested fully assembled at
origin prior to shipping to verify conformance to specs. If partial
shipment is reqd, no welding shall be done on the bolts located on the
legs when fully assembled & assembly markings such as widow marks are
to be provided along w/assembly directions. Sketch must be submitted
w/the tech manuals showing the partial assembly sections. Include 3
sets of tech manuals in English on instln/set-up, operating,
maintenance, troubleshooting & repair procedures, a listing of parts &
components (including part numbers) contained in the eqpt & schematic
diagrams of the electrical system. Unless otherwise specified in the
contract, the contractor isresponsible for the performance of all
inspection reqmts as specified herein. If for any reason the
operational or in-service test fails, the cost to return (shipping of
eqpt, etc.) will be charged to the contractor. Delivery is required
within 100 days after award of contract to be delivered FOB Destination
to Pearl Harbor Naval Shipyard, Bldg. 167, Pearl Harbor, HI 96860-5351.
Inspection & Acceptance shall be at destination. Standard practice for
Commercial Packaging. The provision at FAR 52.212-1, Instructions to
Offerors-Commercial Items applies. Addendum to FAR 52.212-1: Paragraph
(b), Technical Description substitute "Descriptive literature" for
"technical description."; Paragraph (h), Multiple awards-Delete entire
paragraph. Substitute "Award. The Govt plans to award a single
contract resulting from this solicitation." Offerors are required to
complete & include a copy of the following provisions w/their
proposals: FAR 52.212-3, Offeror Representation &
Certifications-Commercial Items, DFARS 252.212-7000, Offeror
Representations & Certifications-Commercial Items. Also, DFARS
252-225-7000, Buy American Act & Balance of Payments Program
Certificate, DFARS 252.233-7000, Certification of Claims & Requests for
Adjustment or Relief. Clause 52.212-4, Contract Terms &
Conditions-Commercial Items, applies. Addendum to FAR 52.212-4:
Paragraph (o) Warranty-Add: "Additionally, the Govt will accept the
contractor's commercial warranty." Add the following addendum clauses,
FAR 52.209-7, Organizational Conflicts of Interest
Certificate-Marketing Consultants; FAR 52.211-5, New Material;
52.211-6, Listing of Other Than New Material, Residual Inventory, and
Former Government Surplus Property; FAR 52.211-7 Other Than New
Material, Residual Inventory, & Former Government Surplus Property, &
provision: FAR 52.215-18, Facsimile Proposals. The clause at FAR
52.212-5, Contract Terms & Conditions Required to Implement Statutes or
Executive Orders-Commercial Items applies w/ the following applicable
clauses for paragraph (b): FAR 52.203-6, Restrictions on Subcontractor
Sales to the Govt-Alternate I, FAR 52.203-10, Price or Fee Adjustment
for Illegal or Improper Activity, FAR 52.219-8, Utilization of Small
Business Concerns & Small Disadvantaged Business Concerns, FAR
52.219-9, Small, Small Disadvantaged & Women-Owned Small Business
Subcontracting Plan, FAR 52.222-26, Equal Opportunity, FAR 52.222-35
Affirmative Action for Special Disabled & Vietnam Era Veterans, FAR
52.222-36, Affirmative Action for Handicapped Workers, FAR 52.222-37,
Employment Reports on Special Disabled Veterans & Veterans of the
Vietnam Era, FAR 52.247-64, Preference for Privately Owned U.S.-Flag
Commercial Vessels. DFARS 252.212-7001, Contract Terms & Conditions
Required to Implement Statutes or Executive Orders Applicable to
Defense Acquisition Commercial Items, applies w/the following clauses
applicable to paragraph (b): DFARS 252.205-7000, Provision of
Information to Cooperative Agreement Holders, DFARS 252.219-7003, Small
Business & Small Disadvantaged Business Subcontracting Plan (DoD
Contracts), DFARS 252.219-7006, Notice of Evaluation Preference for
Small Disadvantaged Business Concerns-Alt I, DFARS 252.225-7001, Buy
American Act & Balance of Payment Program, DFARS 252.225-7007, Trade
Agreements, DFARS 252.225-7012, Preference for Certain Domestic
Commodities, DFARS 252.233-7000, Certification of Claims & Requests for
Adjustment or Relief, DFARS 252.247-7024, Notification of
Transportation of Supplies by Sea. The Govt intends to make a single
award to the responsible contractor whose proposal is technically
acceptable, in full compliance to all other requirements set forth in
the solicitation & the lowest cost or price. In case of discrepancy
between a unit price/cost and an extended price/cost and an extended
price/cost, the unit price/cost, will be presumed to be correct
subject, however, to correction in the same manner as any other
mistake. The Govt reserves the right to judge which proposals show the
required capability & the right to eliminate from further
consideration those proposals which are considered unacceptable & not
capable of being made acceptable without major rewrite or revision.
Proposals must be received no later than 4:00 p.m. Hawaiian Standard
Time, 06 March 1997. Proposals should be mailed to: Regional
Contracting Department, Fleet & Industrial Supply Center, Bldg. 475,
2nd deck, Pearl Harbor, HI 96860-5300. Facsimile proposals will be
accepted at 808/471-5750 or 474-8885. (0043) Loren Data Corp. http://www.ld.com (SYN# 0264 19970214\38-0003.SOL)
38 - Construction, Mining, Excavating and Highway Maintenance Equip. Index Page
|
|