|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 7,1997 PSA#1778OC-ALC/PKC, Attn: Ken Thomason, 3001 Staff Dr., Ste. 2AH81A, Tinker
AFB, OK 73145-3064 J -- MAINTENANCE AND/OR REPAIR OF EQUIPMENT -- POTENTIAL SOURCES
SOUGHT POC Ken Thomason, FAX (405) 739-2699. Potential sources sought
-- OC-ALC is conducting a market survey for Contractor Logistics
Support (CLS) for the KC-10/KDC-10 Aircraft with a projected contract
award date of June 1998. There are a quantity of 59 KC-10A aircraft and
2 KDC-10 aircraft. 88 percent of the systems on these aircraft are
DC-10 common with each having additional systems and equipment
necessary for their military missions. The KC-10A fleet has additional
military avionics equipment, an aerial refueling boom, and an aerial
refueling receptacle. They are currently being modified to add
wing-mounted pods to further enhance aerial refueling capabilities. The
KC-10 is also capable of combining the tasks of tanker and cargo
aircraft with capacity to carry up to 75 people and about 170,000
pounds of cargo. The current CLS contract includes Programmed Depot
Maintenance, drop-in depot level maintenance, depot modifications,
component overhaul, logistics supply/support and engine overhauls. The
KDC-10 aircraft are modified DC-10-30CF aircraft that were converted
to tankers for the Royal Netherlands Air Force (RNLAF) and have boom
refueling capabilities as well as cargo/passenger capabilities. Under
the KC-10 contract the CLS contractor will provide support for the
peculiar refueling systems on the KDC-10 aircraft. At a minimum,
prospective contractors will need to have available facilities
including hangar space for three DC-10-30 Aircraft with related DC-10
common support equipment, a paint facility for Aerospace vehicle
painting and paint removal that meets the requirements of the National
Fire Protection Association (NFPA) 410, Chapter 5 and with a vapor
control system that prevents vapor concentrations from exceeding 500
parts per million or 20% Lower Explosive Limit (LEL), whichever is
lower. These depot facilities will need to be serviced by a runway that
meets the minimum requirement for KC-10 operations of 7,000 ft. in
length, 150 ft. width and 75 ft. wide taxi areas all capable of
supporting a 450K G.W. aircraft. Contractor engine overhaul facilities
must be certified to overhaul/repair General Electric CF6-50-C2
engines. Any company interested in this requirement should do so in
writing to OC-ALC/PKC; Attn: Ken Thomason; 3001 Staff Drive; Tinker
AFB, OK 73145-3064; FAX (405) 739-2699. (0036) Loren Data Corp. http://www.ld.com (SYN# 0037 19970207\J-0003.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|