|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 8,1997 PSA#1757Arnold Engineering Development Center, ATTN: PKP, 100 Kindel Drive,
Suite A332, Arnold AFB TN 37389-1332 Z -- REPLACE REFER BAY CRANE AC&T SOLNBR>F40650-97-B-0011 Z -- REPLACE REFER BAY CRANE AC&T SOLNBR>F40650-97-B-0011 DUE 021997 POC Emily Walker, Contract
Specialist, (615) 454-7841 This project is for the design and
installation required to replace a 10/2 ton crane with a Class C 15/2
ton bridge crane at Arnold AFB TN. The crane is used to perform
precision positioning of critical and near rated-capacity loads. The
contract performance period will be 260 days after issuance of notice
to proceed. The estimated magnitude is between $100,000 to $250,000.
Any responsible source may submit a bid which shall be considered.
Firms that respond to this synopsis should do so in writing within 15
days of this publication. See Note(s): 26. (0006) Loren Data Corp. http://www.ld.com (SYN# 0088 19970108\Z-0009.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|