COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 9,1996 PSA#1737SOUTHWESTNAVFACENGCOM (Code 0212), 1220 Pacific Highway, San Diego, CA
92132-5187 Z -- REPLACE F-76 PUMPS DFSP PROJECT #SPO 93-9, DEFENSE FUEL SUPPLY
POINT, SAN PEDRO, CA SOL N68711-94-B-1473 DUE 012797 POC For Plans and
Specs info call 619-532-2082/Contracts Specialist, Lucile
Miranda/Contracting Officer, Maria Williams/For Bid results call
619-532-2355. DESCRIPTION OF WORK -- The work includes replacement of
twelve verticle can pumps located in six pump houses with three new
pumps housed in a new pump house. The three new pumps will be API 610
horizontal split case pumps complete with associated piping, valves and
electrical wiring. The abandoned pump houses are numbered 201 through
206 and are located in the southeast corner of the facility. The
pumping system is ued for distribution of F-76 fuel between D.F.S.P.
tank farm located on Gaffey St., San Pedro, CA and the fuel loading
pier located on the Naval Shipyards in Long Beach, CA. The new pump
house will be located on the east side of the old pump house road. The
new pump house will be above ground concrete block building. The
existing six pump houses will be abandoned in place. The piping to the
existing pump houses is to be disconnected and capped at the Dresser
couplings within the respective existing valve pits as shown on the
construction drawings. The new piping will be installed connecting the
existing valve put to the new pumps. All three pumps use a common
suction line from one main distribution header. The pumps discharge
into a common header to another main distribution header. Isolation
valves and check valves are provided as indicated. Electrical power for
the pumps will be 2400v and will be routed from the existing 2400v line
to the new pump house. Control of the pumps (starting and stopping)
will be accomplished by extending the control wiring from the existing
pump house No. 206 to the new pump house. All of the new isolation
valves are double block and bleed twin seal type plug valves and will
have electric motor operators. The electric motor operators will be
connected to the 480v electric power. For this contract the control
wiring will not be connected to the Pump House 113 control system.
Valve control will be local with electrical switches located on the
valve actuators, and incidental related work complete and ready for
use. -- The estimated cost is between $500,000 and $1,000,000. -- Firm
Fixed Price Contract. -- Contract duration is 270 calendar days. --
Bids will be considered from all responsible sources. -- This project
is unrestricted. -- The Standard Industrial Code is 1629 and the annual
size standard is $17 million. -- It is recommended the subcontracting
plan goals reflect a minimum goal of 5% for Small Disadvantaged
Business subcontracting effort. -- NOTE: Plans and specs will not be
mailed to firms within a 20 mile radius of the issuing office. A fee
will be charged for all plans and specs. Each set will cost $43.00. --
-- Solicitation packages may be acquired in person from Plan Issue or
by mail. -- Telephone requests will not be accepted. -- Requests for
the solicitation package must be in writing stating solicitation number
N68711-94-B-1473, complete name, address, area code and phone number
and whether bidding as a prime/subcontractor/supplier. -Plan holders
lists will not be faxed. -- Mail requests to Southwest Division, Naval
Facilities Engineering Command (Plan Issue), Building 132, 1220
Pacific Highway, San Diego, CA 92132-5187 with a check payable to
DEFENSE PRINTING SERVICE. -- Fees are not refundable. -- Submit one (1)
check per project. -- Solicitation packages are limited to two (2) sets
per prime and one (1) per subcontractor/supplier. -- Plans and
specifications will be available on or about 24 December 1996. (0340) Loren Data Corp. http://www.ld.com (SYN# 0124 19961209\Z-0027.SOL)