COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 20,1996 PSA#1725DEPT OF JUSTICE, FED PRISON INDUSTRIES, 320 1ST STREET NW - Material
Mgt Branch, WASHINGTON, DC 20534-0001 34 -- INDUSTRIAL PAINT SPRAY BOOTH SOL 1PI-R-0632-97 DUE 112796 POC
Contracting Officer, TURNER, KYLE, 202-508-8503 Synopsis/solicitation
1PI-R-0632-97 is hereby amended to clarify the specification with the
following information and to change the date for receipt of proposals
from Nov 18, 1996 to Nov 27, 1996 at 1:00 pm. The height of the trolley
system should provide a 10' clearance to the floor. The trolley system
should be approximately 12' wide and 36' in length (drawing available
upon request via FAX). The conveyor openings should be placed on the
12' Length side walls. The trolley system should be anchor bolted to
the concrete floor. The distance from the paint kitchen to the existing
building roof line is 22 ft, 8 inches. The roof line is flat. The air
make-up unit and exhaust fans are to be installed on the exterior roof
of the building. Contact Kyle Turner at 202/508-8503 for information
regarding this(0323) Loren Data Corp. http://www.ld.com (SYN# 0184 19961119\34-0002.SOL)