|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 7,1996 PSA#1717US ARMY ENGINEER DISTRICT, FTW, P O BOX 17300, 819 TAYLOR ST, FT. WORTH
TX 76102-0300 Y -- COMBAT ARMS TRAINING FACILITY, LACKLAND AFB, TEXAS SOL
DACA63-97-B-0005 DUE 112196 POC Contract Specialist SHARON L HAIR (817)
978-3194 (Site Code DACA63) The work consists of 1) The construction of
an approximately 3,272 M2 sprinklered training facility with an arms
vault utilizing rock-faced intergrally colored and waterproofed
concrete masonry unit (ICMU) veneer with ICMU, Metal stud, or concrete
back-up wall construction; metal building structural framing members;
standing seam metal roof; grade beams with shallow foundation pads;
HVAC; plumbing; electrical systems - power, lights, fire alarm, public
address, and communications; interior finishes - ceramic tile, carpet,
vinyl tile, epoxy floor coating, vinyl wall covering, paint, acoustical
ceiling tile, and pre-wired work stations; 2) The approximately 3.22 KM
extension of utility lines to the project site - gas,
telecommunications, fiber optics, and forced main; and 3) The option to
demolish and/or remove existing wood framed facilities, paving, and
utilities - on and off site. Asbestos containing materials and lead
base contaminants are present at the facilities to be demolished.
Estimated Cost Range: $1,000,000 to $5,000,000 - - Bid sets available
at $57.00 for half-size and $117.00 for full-size. No individual sheets
of half-size drawings may be purchased. Requests by mail must include
payment in the applicable amount by company check or money order made
payable to F&A Officer USAED FTW and sent to: USACE, Attn: Room 2A19,
Post Office Box 17300, 819 Taylor Street, Fort Worth, Texas 76102-0300.
NO EXPRESS MAIL PROCEDURES WILL BE UTILIZED ON INITIAL MAILINGS OF
PLANS AND SPECIFICATIONS. No refund will be made and materials need not
be returned. If project is cancelled or no award is made, cost of plans
and specifications will be refunded only on written requests.
Solicitation to be issued on or about 21 Nov 96. Bid opening on or
about 23 Dec 96. Duration of contract 360 days. If a large business
firm is selected for this announcement, it must comply with FAR
52.219-9 clause regarding the requirement for a subcontracting plan.
The Fort Worth District's subcontracting goal is for 55.0% of the total
subcontracted dollars to go to Small Businesses (SB), 8.5% to Small
Disadvantaged Business (SDB), 5.5% with Historical Black Colleges or
Minority Institutions (HBC/MI), and 3.0% to Women Owned Small Business
(WOB). Bids from all responsible sources will be considered. SIC Code
for this procurement is 1542, Small Business Size Standard is $17
million. (0310) Loren Data Corp. http://www.ld.com (SYN# 0102 19961106\Y-0003.SOL)
Y - Construction of Structures and Facilities Index Page
|
|