|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 5,1996 PSA#1715US ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, Attn: CENAN-EN-MR, 26
Federal Plaza, Rm 2133, New York, N.Y. 10278-0900 C -- ARCHITECT ENGINEER SERVICES, INDEFINITE DELIVERY CONTRACTS NO. 30
& 31 FOR GENERAL ENGINEERING SERVICES AT PICATINNY ARSENAL, SOL
CBAEEN-6305-0006 POC Willien Cunningham, Procurement Assistant,
212-264-9123. Location of work is Picatinny Arsenal, New Jersey. The
services will be provided under an Indefinite Delivery contract. The
cumulative amount of all Delivery Orders for each contract will not
exceed $750,000, and each delivery order will not exceed $150,000.
Delivery Orders may be issued for a period of one year from the date of
the contract award. Both contracts will include an option for one
additional year under the same terms and conditions as the basic
contract. The option year may be awarded after the monetary limit is
reached on the first year and prior to the time (365 day) limit. The
Government's obligation to guarantee a minimum amount for payment will
apply to both first and second years of the contract of each contract.
This amount is $15,000 for the first year and $7,500 for the second
year. Project Information: Preparation of design and construction
documents including plans, specifications, cost estimates, design
analysis and construction services for various projects to include, but
not be limited in scope to, rehabilitation of military, administrative,
laboratories, residential and industrial buildings, HVAC systems,
foundation, civil/site work and hazardous materials' abatement, which
may include, asbestos, lead paint, radon and PCB's. In addition,
hazardous toxic and waste soil testing, topographic and Geotechnical
surveying capabilities are required. The specific abilities and
disciplines required are: Full in-house capability is preferred. Firms
not having full in-house capability must demonstrate how they will
manage their subcontractors and insure quality control. The prime must
identify in their submittal the quantity and disciplines of personnel
in their working office and supporting offices. Specific capabilities
required are (in random order): electrical, mechanical, civil,
environmental, structural, fire protection, architectural, and
certified asbestos surveying personnel. In addition, a fire
protection/detection specialist and topo/geotech surveying personnel
are required. Personnel registered in the state of New Jersey are
required. Special Qualifications: Previous experience with design of
projects on military installations involving
administration/lab/industrial projects is preferred. Experience in the
preparation of Project Funding Justification Document (DD1391) is also
preferred. In addition, coordination experience with environmental
regulatory agencies (i.e. NJDEP, EPA, etc.) is required. Responding
firms should indicate their ability to access the Automated Review
Management System (ARMS). Closing date for submitting SF255: 30 days
after advertising date. If this date falls on a Saturday, Sunday, or
Holiday the closing date will be on the next business day. Firms should
submit their qualifications on 11-92 version of SF255 and SF254. SF254
should reflect the overall firms capacity, whereas, SF255 should
reflect only the personnel dedicated to the specific project referenced
in the submittal. If subconsultants are to be utilitized, a SF254 must
be submitted for each subconsultant. These guidelines should be
closely followed, since they constitute procedural protocol in the
manner in which the selection process is conducted. Evaluation factors
in descending order of importance: a. Professional qualifications
necessary for satisfactory performance of required services. b.
Specialized experience and technical competence in the type of work
required. c. Capacity to accomplish the work within the required time.
d. Past performance on contracts with government agencies and private
industry in terms of cost control, quality of work and compliance with
performance schedules. e. Knowledge of the locality and location in the
general geographical area of Picatinny Arsenal provided that
application of this criterion leaves an appropriate number of qualified
firms, given the nature and size of the project. Note: Firms are
encouraged to submit from any geographical area. f. Extent of
participation of small businesses, small disadvantaged businesses,
historically black colleges and universities, and minority institutions
in the proposed contract team, measured as a percentage of the total
estimated effort. g. Volume of work previously awarded to the firm by
the Department of Defense, with the object of effecting an equitable
distribution among qualified A/E firms, including small and small
disadvantaged business firms and firms that have not had prior DoD
contracts. Start date/Completion: April 1997 to April 1999. Small and
small disadvantaged firms are encouraged to participate as prime
contractors or as members of joint ventures with other small
businesses. All interested large firms are reminded that the successful
firm will be expected to place subcontracts to the maximum practicable
extent with small and small disadvantaged firms in accordance with
Public Law 95-507. If a large business firm is selected, a small
business subcontracting plan will be required prior to award. Firms
which have not previously applied for New York District projects and
firms which do not have a current SF-254 on file with the New York
District should submit three (3) copies with this initial response to
CBD announcement. Firms using consultants should submit copies of the
SF-254 for their consultants. a) Notification of all firms will be made
within 10 calendar days after approval of the Final selection.
Notifications will not be sent after preselection approval. The
notification will say the firm was not among the most highly qualified
firms and that the firm may request a debriefing. b) The A/E's request
for a debriefing must be received by the selection chairperson within
30 calendar days after the date on which the firm received the
notification. c) Debriefing(s) will occur within 14 calendar days after
receipt of the written request. d) Copies of all SF 254's & SF 255's of
all firms, who are not short listed, will be held for 30 calendar days
after notifications are sent out. Three (3) copies of the submittals
should be sent to Ms. Willien Cunningham, CENAN-EN-MR, Room 2133, 26
Federal Plaza, New York, NY 10278, (212) 264-9123. (0306) Loren Data Corp. http://www.ld.com (SYN# 0018 19961104\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|