|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 3,1996 PSA#1693U.S. Army Aviation and Troop Command, 4300 Goodfellow Blvd, St. Louis,
MO 63120 59 -- CIRCUIT CARD ASSEMBLY, WIRING HARNESS ELECTRONIC COMPONENT,
BACKPLANE ASSEMBLY, COLLIMATOR INFRARE, CABLE ASSEMBLY, R DIRECT,
HOUSING HEATER SOL DAAJ09-96-R-0594 DUE 110896 POC Evelyn Kelley,
Contract Specialist, (314)263-0792, fax 314-263-9012 Marilyn J.
Bladdick, Contracting Officer (314)263-0795. Amended: This action was
originally publicized in the Commerce Business Daily (CBD) on July 15,
1996, Record Number 1636PR590004. This synopsis is being modified for
the following reasons: In accordance with FAR 16.504, the Government
intends to award and Indefinite Delivery Indefinite Quantity Contract
for a three-year period, to Lockheed Martin Electronic & Missiles
Incorporated, in lieu of 5-years. The Shroud Assembly, NSN:
1270-01-282-1119, PN: 13076080-039, Qty: Min 8, Max 33, is deleted from
this requirement. The quantity on the Electronic Component, NSN:
5998-01-392-6177 is revised to Min:11 each, Max: 20 each; and the Power
Frame Assembly quantity is revised to Min: 68 each, Max: 136 each. The
following twelve (12) items are being added to this requirement:
NOUN:............NSN................PN..............QTY: Min/Max...
Circuit Card.....5998-01-328-1986...13231509.............22/30.....
Circuit Card.....5998-01-306-5820...13076348-059.........20/80.....
Circuit Card.....5998-01-391-7842...13076658-009.........24/60.....
Circuit Card.....5998-01-387-3049...13080446-029........120/204....
Circuit Card.....5998-01-423-8525...13075826-049.........24/48.....
Wiring Harness...5995-01-399-6797...13080284-049........100/487....
Electronic Comp..5998-01-199-2263...13076284.............48/72.....
Backplane Assy...5998-01-204-7896...13075955............108/192....
Collimator.......5855-01-305-2196...13074116-529.........13/17.....
Cable Assy.......6150-01-349-3527...13231512.............10/18.....
Motor Direct.....6105-01-261-7827...13075547.............24/48.....
Housing Heater...2540-01-373-2780...13075730...........120/168..... FOB
Origin with all deliveries to the U.S. Army AH-64 Support Trade Center,
1700 Tradeport Drive, Orlando, Florida
32824-7007.........................................................
First Article Testing is required on the folowing items: Circuit Card
Assembly, NSN: 5998-01-391-7842; Circuit Card Assembly, NSN:
5998-01-423-8525; and Backplane Assembly, NSN: 5998-01-204-7896. First
Article Test Reports will be due between 288 and 339 days after date
of contract award. The required delivery schedule when First Article
Testing is required is between 450 and 750 days after date of contract
award. The requried delivery when First Article is not required is
between 180 and 300 days after date of contract award. This is not a
competitive procurement the Government does not have drawings for any
of the above twelve (12) items. All other information publicized in the
original synopsis is correct. See Numbered Note(s): 22. (0275) Loren Data Corp. http://www.ld.com (SYN# 0194 19961002\59-0001.SOL)
59 - Electrical and Electronic Equipment Components Index Page
|
|