COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 3,1996 PSA#1671TOBYHANNA ARMY DEPOT, ATTN SIOTY-KO, 11 HAP ARNOLD BLVD, TOBYHANNA PA
18466-5100 Z -- INSTALLATION OF NEW INDUSTRIAL RESINOUS FLOORING SYSTEM OVER
AUTOMATIC GUIDED VEHICLE SYSTEM GUIDEPATH IN BLDG 1C AT TOBYHANNA ARMY
DEPOT, TOBYHANNA, PA 18466 SOL DAAC71-96-B-0018 DUE 101496 POC
Contract Specialist JOE SANTILLO (717) 895-7517 Contracting Officer
JOYCE K. BEDNAR (717) 895-6369 (Site Code DAAC71) Work includes but is
not limited to: demolition of damaged existing industrial resinous
flooring system; preparation of concrete substrate by mechanical
abrasive blasting; repair of major cracks and deteriorated concrete;
application of penetrating two-compound conductive epoxy primer;
application of 1/4 inch thick static disspative, three component,
troweled mortar floor consisting of epoxy resin, curing agent and
graded aggregates with conductive elements; application of minimum
total thickness of 8 mils of two component, high solids, epoxy based
conductive sealer; installation of required control and expansion
joints; protection of buried AGVS guidewire during preparation and
overlayment; protection of the floor until overlayment is cured;
clean-up and disposal. Completion is approximately 180 days after
notice to proceed. Magnitude is between $100,000 and $250,000.
DAAC71-96-B-0018 applies. Approximate issue/open dates are 13 Sep/14
Oct 96; exact dates will be cited in the solicitation document and will
be determined at the time it is actually available for issuance.
Responses to this presolicitation notice and solicitation synopsis are
requested within ten days of the date of publication of this synopsis.
When making a request, please identify business size; SIC is 1752/$7
million. All resonsible sources may submit a bid which will be
considered. (0242) Loren Data Corp. http://www.ld.com (SYN# 0113 19960830\Z-0001.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|