COMMERCE BUSINESS DAILY ISSUE OF JULY 1,1996 PSA#1627JACKSONVILLE DISTRICT OFFICE, U.S. ARMY CORPS OF ENGINEERS, P.O. BOX
4970, JACKSONVILLE, FL 32232-0019 Y -- TIGERTAI CAMP, DADE COUNTY, CENTRAL AND SOUTHERN FLORIDA PROJECT
FOR FLOOD CONTROL AND OTHER PURPOSES SOL DACW17-96-B-0019 DUE 092496
POC Contract Specialist Robert Mosteller (904) 232-3739 (Site Code
DACW17) Work shall be accoplished in two phases, PHASE 1 shall consist
of installing new potable well; placing fill; constructing new
maintenance shed; providing temporary utilities (water and power); and,
providing level pads for mobile home sites adjacent to the existing
home sites. The construction time for Phase 1 is 90 calendar days. The
Contractor will demobilize and leave the site for approximately 90
calendar days while families are being relocated. PHASE 2 work will
consist of demolitition of the existing home sites; transplanting 6
palm trees; placing approximately 6,500 cubic yards of fill material;
installing new sanitary, electrical and water systems and providing
stub outs for future homes; and, constructing two gravel parking areas,
a bulkhead with small pier for boat access, and new wood fencing along
canal. The construction time for Phase 2 is 120 calendar days.
Magnitude of construction is between $100,000 to $500,000.
Pre-Solicitation Notice will be issued on or about 19 Jun 96.
Invitation DACW17-96-B-0019 will be issued on or about 05 Aug 96 and
opened on or about 24 Sept 96. Cost of Plans and Specification is
$35.00. Checks should be made to F & A Mobile District, and sent to
U.S. Army Corps of Engineers, Jacksonville, Florida. THIS IS AN
UNRESTRICTED ACQUISITION BEING SOLICITED AND AWARDED UNDER THE SMALL
BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM. ALL BUSINESSES ARE
ENCOURAGED TO RESPOND. SIC Code 1629. (0179) Loren Data Corp. http://www.ld.com (SYN# 0136 19960628\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|