COMMERCE BUSINESS DAILY ISSUE OF MAY 21,1996 PSA#1599Commander, Pacific Division, Naval Facilities Engineering Command,
Contracts Department, 4262 Radford Drive, Honolulu, HI 96818-3296 (Code
0212) Y -- FY96 BRAC PROJECT 267T/FY97 BRAC PROJECT P-268T, AND FY96 BRAC
PROJECT P-269T, MODIFY WASH/RINSE FACILITY, AIRCRAFT APRON, MARINE
CORPS BASE HAWAII, KANEOHE BAY, HAWAII SOL N62742-95-R-1341 DUE 070996
POC Contact Mr. Ira Kight, Procurement Technician, Ms. June Turner,
Contract Specialist, Telephone No. (808) 474-5518, Facsimile No. (808)
474-7316 The Department of the Navy solicits proposals for the
construction of aircraft apron and modification of wash/rinse facility.
Procurement consolidates BRAC FY96 P-267T Project Aircraft Apron and
Project P-269-T, Modify Wash/Rinse Facility as Base Item 1 and BRAC
FY97 Project P-268T Additional Aircraft Apron as Option 0001. The scope
includes reinforced concrete aircraft parking apron, taxiway lighting,
asphaltic concrete taxiways, blast fences, reinforced concrete
drainage box culvert, construct new facilities displaced by the
aircraft parking apron, and demolish displaced facilities. Displaced
facilities include direct refueler support office, apron electric
building, temporary helicopter wash facility, aircraft engine test
facility, LOX/N2 storage facility, refueling truck facility, aircraft
cyrogenics facility, and ''B'' Street realignment. Supporting
facilities include connecting water, sewer and electrial utilities,
chain link fence and gates, softball field, grassing, storm drain
system, and site improvements. Work also includes archaeological
monitoring and investigation, and proper removal and disposal according
to applicable rules and regulations of asbestos contaiing materials,
lead based paint, and PCBs resulting from demolition work. Wash
Facility: The work includes removal work, earthwork for portland cement
concrete wash pad, asphaltic concrete tow-away, concrete wall with
utility outlets, drain inlets and lines, area lighting, electrical work
and incidental related work. Rinse Facility: The work includes removal
work, earthwork for portland cement concrete rinse pad, widening of
asphaltic concrete taxiway, trench drains with galvanized steel covers,
concrete and CMU structure, water line, spray nozzles, concrete valve
boxes, electrical work and incidental related work. The work also
includes site clearing, grading, grassing, and taxiway lighting. The
Option 0001 will be evaluated for selection with the Base Item and
award exercised within 180 calendar days after award of Base Item. The
contract period of performance is 270 calendar days for Base Item 1
and 500 calendar days for Option 0001. Contract completion time:
Approximately 770 calendar days. The following evaluation factors will
be used in the selection of the firm: (a) Proposer's Qualifications
and Ability to Perform; (b) Management Plan; and (c) Subcontracting
Program/Plan. Award will be made to the technically qualified, low
price offeror for Base Item and Option 0001. This is a firm fixed price
contract. The estimated cost is between $25,000,000 and $100,000,000.
This procurement is unrestricted, therefore, replies to this notice are
requested from all business concerns as well as from small business,
small disadvantaged business, and woman owned small business. THE SIC
CODE FOR THIS PROCUREMENT IS 1611 AND THE ANNUAL SIZE STANDARD IS $17.0
MIL. This is not a public bid opening. The request for proposal (RFP)
plans and specifications will be available on or about 14 June 1996.
For all construction contracts in excess of $1,000,000, a Small
Business and Small Disadvantaged Business Subcontracting Plan is
required by large firms prior to award. Requests for copies of this
solicitation should be postmarked not later than 15 days from the date
of publication of this synopsis in the CBD. Requests postmarked later
than that date may not be honored. Requests may be made by letter but
telephone requests will not be honored. DUE TO THE HIGH COST OF
REPRODUCTION, THERE IS A NON-REFUNDABLE CHARGE OF $100.00 FOR EACH SET.
PAYMENT IN THE FORM OF A CHECK OR MONEY ORDER SHOULD BE MADE PAYABLE TO
THE U. S. TREASURY. Availability of the solicitation is limited and
will be furnished on a first- received, first-served basis. Please
furnish information whether firm is interested as a Prime contractor or
Subcontractor. Bid opening date is approx. Synopsis #23. (0138) Loren Data Corp. http://www.ld.com (SYN# 0106 19960520\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|