|
COMMERCE BUSINESS DAILY ISSUE OF MAY 17,1996 PSA#1597US ARMY CORPS OF ENGINEERS FT WORTH DIST, 819 TAYLOR STREET, ROOM 6A18,
P O BOX 17300 ATTN CESWF-ED-MC, FORT WORTH TX 76102-0300 C -- UP TO TWO INDEFINITE DELIVERY CONTRACTS/(IDC'S) FOR
MULTIDISCIPLINE DESIGN SERVICES FOR (PRIMARILY MECHNICAL ELECTRICAL)
PROJECTS ASSIGNED TO THE FORT WORTH DISTRICT SOL DACA63-96-R-0033 DUE
073096 POC Contract: Sharon McLellan (817)334-3939 (Site Code DACA63)
1. CONTRACT INFORMATION: The work may involve Design, Drafting,
Planning, Studies and Site Investigations associated with this type of
project. All work must be done by or under the direct supervision of
licensed professional Engineers or Architects. Estimated A-E Fee
Including Option: $1,500,000.00 maximum ($750,000.00 basic; $750,000.00
option), with a maximum Delivery Order amount of $150,000.00. The base
and option period amounts may be increased to $2,000,000.00
($1,000,000.00 basic; $1,000,000.00 option), with a Delivery Order (DO)
limit of $200,000.00 upon enactment of anticipated new limits. If a
large business firm is selected for this announcement it must comply
with the FAR 52.219-9 clause regarding the requirement for a
subcontracting plan. The Fort Worth district's goal on work to be
subcontracted is that a minimum of 52.5% of the Contractor's total
intended subcontract amount be placed as follows: 8.8% be placed with
Small Disadvantaged Businesses (SDB); 5.5% be placed with Historically
Black Colleges and Universities/ Minority Institutions (HBCU/MI); 3%
be placed with Women Owned Small Businesses (WOB); and the remaining
35.2% be placed with Small Businesses (SB) for a total of 52.5%. The
plan is not required as part of this submittal. The proposed services
will be obtained by Negotiated Fixed Price Contract. Projects outside
the primary area of responsibility may be added at the Government's
discretion upon agreement of the selected firm. Option periods will be
exercised at the government's discretion. The first IDC is expected to
be awarded on or about October 1996. The second and third IDC may be
awarded at a later date. Each contract will be for a base period, not
to exceed one year, and one option period, not to exceed one year. The
work will be allocated, by issuance of individual delivery orders,
among the three selected firms by Specialized Experience, Equitable
Distribution of Work, and Location of the Firm, in that order. Pursuant
to the Federal Information Resources Management Regulation (FIRMR),
Section 201-39.5202-3, this acquisition is not being conducted under
the FIRMR; however, any modifications requiring Federal Information
Processing (FIP) resources will be conducted under specific agency
delegation of GSAs exclusive procurement authority for FIP resources.
The specific GSA DPA case number is KAA-95-AD-012. 2. PROJECT
INFORMATION: The work may involve Design, Drafting, Planning, Studies
and Site Investigations associated with an Indefinite Delivery Contract
for projects which are primarily of a mechanical, electrical nature.
Projects are expected to be for maintenance, repair or alterations to
existing facilities and/or small new construction. Work may also
include designs/studies for HVAC and electrical systems, upgrades and
identification of environmental HTRW hazards encountered during site
investigations. Projects may be required to be designed using metric
system. Services during a project's construction phase may also be
required. 3. SELECTION CRITERIA: See CBD Note No. 24 (Monday issue) for
general description of selection process. Selection criteria in
descending order of importance are as follows: (a) Professional
Qualifications: This type of Indefinite Delivery Contract will require,
(either in-house or through consultant) as a minimum, the following:
Two Architects, three Electrical, three Mechanical, two Civil and two
Structural Engineers. The firm must also have the capability to
accomplish Value Engineering, Cost Estimating, Specification Writing,
Surveying, Construction Inspection, Environmental Design/ Remediation
Expertise, lab testing and design to Fire Protection/Life Safety codes.
(b) Specialized Experience and Technical Competence: (1) The selected
team must demonstrate extensive experience in the design of: New
Construction repair, renovation or alteration of existing mechanical,
electrical systems and infrastructures paying particular attentions to
area regulations and requirements. (2) Firms must show experience in
evaluating contractor's submittals and construction surveillance. (3)
Firms must have at least two year's experience in Fire Protection/Life
Safety Design and be familiar with the use and application of NFPA
codes 80 and 101 and MIL-HDBK-1008B. Demonstrate experience in working
with a testing laboratory to design for water quality, removal of
friable asbestos and remediation of lead-based paint hazards and
underground toxic substances. (c) Firms must show adequate team
capacity to design three DO's concurrently meeting all schedules. (d)
Firms must demonstrate past performance with respect to cost control,
quality of work, and compliance with performance schedules. (e)
Geographical Location: Firms must show familiarity with the Texas, New
Mexico and Louisiana areas. Firms must address fast response
capabilities. (f) Firms must demonstrate the capability to prepare
specifications and construction cost estimates on IBM compatible
equipment. Construction cost estimates will be prepared using our PC
based computer Aided Cost Estimating System (M-CACES) (Software will be
provided). Computer Media for a Computer Aided Design and Drafting
(CADD) system will be Auto CADD or Intergraph compatible. (g) Firms
must show extent of participation of SB, SDB, WOB, and HBCU/MI in the
proposed contract team, measured as a percentage of the total estimated
effort. 4. SUBMITTAL REQUIREMENT: (a) See Note No. 24 for general
submission requirements. Interested firms must provide one submittal
package including an original SF 254 and SF 255 no later than 4:30 p.m.
on the 30th day after the date of this announcement, or the date noted
above, whichever is latest, to be considered. The 11/92 version of the
forms must be used. If the 30th day is a Saturday, Sunday or Federal
Holiday, the deadline is 4:30 p.m. of the next business day. (b)
Responding firms must submit a current and accurate SF 254 for
themselves and each proposed consultant. It must be provided for the
specific office proposed to do the work. Indicate in Block No. 4 of SF
254 if your firm is a Large, Small, Small and Disadvantaged or
Woman-Owned Business. To be classified as a small business under SIC
Code 8711, a firm's average annual receipts or sales for the preceding
three fiscal years, must not exceed $2.5 million. (c) Submit only one
SF 255, completed in accordance with the instructions. It must contain
information in sufficient detail to identify the team (prime and
consultants) proposed for the contract. (d) Include CBD announcement
number in Block NO. 2b of the SF 255. (e) In Block No. 4 of the SF 255,
insert the number of personnel proposed for the contracts (not
necessarily total capacity), Consultants as (A) and in-house as (B).
(f) In Block No. 6 of the SF 255, identify the discipline/service to be
supplied by each consultant. Provide brief resumes of the on-staff or
consultant employees you intend to use to perform the work in the
anticipated design time and the type of projects they will perform in
Block No. 7 of your SF 255. Block No. 7 may be repeated as needed to
identify all the major disciplines and key team members. Selection will
be based on the total team members presented in your SF 255, primarily
in Block No. 4. Resumes must be submitted for all personnel listed in
Block No. 4 to meet the minimums stated in 3a. (g) In Block No 10 of
the SF 255, include a draft Design Quality Control (DQC) Plan. It
should include a brief presentation of internal controls and procedures
that you use to ensure that a quality design is produced. (h) In Block
No. 10 of the SF 255, show last 12 month's DOD awards. (i) Block No.
10 will be limited to ten pages maximum. (j) Personal visits to discuss
this project will not be scheduled. (k) Solicitation packages are not
provided for A-E contracts. This is not a request for proposal (see
Note No. 24).(0136) Loren Data Corp. http://www.ld.com (SYN# 0023 19960516\C-0009.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|