|
COMMERCE BUSINESS DAILY ISSUE OF MAY 14,1996 PSA#1594Oc-Alc/Dir Of Contracting/Propulsion, 3001 Staff Dr Ste 1ag81, Tinker
Air Force Base Ok 73145-3032 J -- HEAT TREATING SERVICES SOL F34601-96-R-54590 DUE 062596 POC For
copy, Madeline Clements/Lpdpa/(405)739-4496, For additional information
contact Madeline Clements/Lpdpa/(405)739-4496 THIS IS A SOURCE SEEKING
SYNOPSIS. The Contractor shall furnish all required labor, facilities,
equipment, transportation and all materials to accomplish HEAT TREATING
of various aircraft engine critical parts and package/palletize those
parts for return to the Air Force, all in accordance with the
provisions of the solicitation and the work specification. The line
items are structured as CYCLES and the number of CYCLES are estimates
only. This will be a one year requirements type contract. Definitions
for all of the CYCLES listed below are covered in the Statement of Work
attached to the solicitation. The quantities shown are Best Estimated
Quantities (BEQ) and represent only the Government's best estimates.
Cycle #1 - Inco 718 Solution Heat Treat, 100 cycles; Cycle #2 - Inco
718 Full Age Cycle, 50 cycles; Cycle #3 - Inco 718 Short Age Cycle, 50
cycles; Cycle #4 - Hast x L605 Solution Heat Treat, 50 cycles; Cycle
#5 - Hast x Alternate Solution Heat Treatment, 25 cycles; Cycle #6 -
Hast x Stress Relief After Welding, 25 cycles; Cycle #7 - Rene 41
Solution Heat Treat, 50 cycles; Cycle #8 - Rene 41 Age Cycle to improve
creep rupture properties, 25 cycles; Cycle #9 - Rene 41 Age Cycle to
maximize fatigue properties, 25 cycles; Cycle #10 - GE Components
Titanium 8A1-1MO-1V Stress Relief, 15 cycles; Cycle #11 - GE Components
Titanium 6A1-4V Stress Relief, 25 cycles; Cycle #12 - PWA Components
Titanium Stress Relief, 50 cycles; Cycle #13 - Waspalloy Solution Heat
Treat, 50 cycles; Cycle #14 - Waspalloy Stabilization Cycle, 50
cycles; Cycle #15 - Waspalloy Age, 50 cycles; Cycle #16 - Rene 77
Solution Heat Treat, 27 cycles; Cycle #17 - Rene 77 Age, 27 cycles;
Cycle #18 - HSI88 Stress Relief, 50 cycles; Cycle #19 - Various Cycles,
100 cycles. All transportation will be furnished by the Contractor.
Furnaces must be certified in accordance with AMS Spec 2750C, Section
3.4.2. Temperature uniformity from set point shall not exceed 15
degrees F. for temperatures under 1500 degrees F. and 25 degrees F. for
temperatures over 1500 degrees. THIS IS A SOURCE SEEKING SYNOPSIS. ALL
INTERESTED SOURCES ARE INVITED TO REQUEST A COPY OF THE SOLICITATION
FOR ADDITIONAL DETAILS OF THE ACQUISITION. PLEASE NOTE THE FOLLOWING
INFORMATION: THIS ACQUISITION IS RESTRICTED TO PROSPECTIVE CONTRACTORS
LOCATED WITHIN 250 MILES OF TINKER AFB OKLAHOMA. OFFERORS OUTSIDE THAT
GEOGRAPHICAL REGION NEED NOT RESPOND. The approximate closing date will
be 25 June 96. The approximate issue/response date will be 24 May 96.
To: Wall Colmonoy Corp, Oklahoma City Ok 73135-4419. No telephone
requests. Only written or faxed requests received directly from the
requestor are acceptable. All responsible sources solicited may submit
a bid, proposal, or quotation which shall be considered. Authority: 10
U.S.C. 2304(C)(1), Justification: Supplies (or Services) required are
available from only one or a limited number of responsible source(s)
and no other type of supplies or services will satisfy agency
requirements. (0131) Loren Data Corp. http://www.ld.com (SYN# 0048 19960513\J-0002.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|