|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 12,1996 PSA#1572Contracting Officer, USCG Civil Engineering Unit Miami, (Rm 651), 909
SE First Ave., Miami, FL 33131-3050 Z -- REPAIR WATERFRONT WHARF AND CONCRETE PIER, INSTALL SEWER LIFT
STATION AND REPAIR FENDER SYSTEMS AT U.S. COAST GUARD STATION CORPUS
CHRISTI AND GALVESTON, TX Sol DTCG82-96-B-3WCA40, contact point,
Elizabeth Phillips, (305) 536-4152. Pre-Solicitation: The work covered
under this project consists of furnishing all labor, tools, equipment,
material, transportation and supervision necessary to repair spalled
concrete on undersides of wharf and pier, and along the cap of the
bulkhead walls; install sewer lift station, force main and concrete
slabs; and replace timber fender system, timber dolphin piling,
concrete batter piles and utility lines and hangers. Performance time
of 150 days. Estimated cost range is between $500,000.00 and
$1,000,000.00. Bid guarantee, payment and performance bonds are
required. Estimated bid opening date is June 1996. This solicitation is
being issued pursuant to Small Business Competitiveness Demonstration
Program. No telephone requests; Only written requests received directly
from the requester will be accepted; however, fax requests may be sent
to (305) 536-7403. (099) Loren Data Corp. http://www.ld.com (SYN# 0131 19960411\Z-0022.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|