COMMERCE BUSINESS DAILY ISSUE OF MARCH 11,1996 PSA#1548U. S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT, 215 NORTH 17th STREET
OMAHA, NE 68102-4978 C -- DESIGN OF SATELLITE CONTROL FACILITY, TECHNICAL SUPPORT FACILITY,
AND ALTERATION OF OPERATIONAL SUPPORT FACILITY, FALCON AFB LORADO SOL
DACA45-96-R-0028 POC For further information, Contact Larry Sand at
(402) 221-4595. CONTRACT INFORMATION: Types of services required will
include surveys, site investigations, concept design, final design
(option), and construction phase services (option). A Fixed Price
Contract will be negotiated for these services. Estimated completion
date is October 1997, with an anticipated start date of June 1996. The
Omaha District will establish a design partnership for this project.
Prior to negotiation, the A-E will attend a one-day partnering meeting
at the Omaha District offices to define Omaha District expectations of
the A-E, create a positive working atmosphere, encourage open
communication and identify common goals. Greater emphasis will also be
placed on the A-E's quality control procedures for this project. The
District will not review quality into the design. The A-E selected for
this project must submit for approval a project-specific design
quality control plan as a condition of contract award. This plan is not
required with this submittal. If a large business is selected for this
project, it must comply with FAR 52.219-9 regarding the requirement
for a subcontracting plan on that part of the work it intends to
contract. This plan is not required with this submittal. The
subcontracting goals for this contract are that a minimum of 53% of the
contractor's intended subcontract amount be placed with small
businesses (SB), including small disadvantaged businesses (SDB) and
women owned businesses (WOB), 9% be placed with SDB, and 3% be placed
with WOB. The on-site data gathering and charrette process will be used
on this project. PROJECT INFORMATION: One A-E firm will be selected to
design all three facilities concurrently. Satellite Control Facility:
A new 31,000 sf, environmentally controlled building to support five
Space Operations Squadron (SOPS) satellite control system missions. The
building will include RFI shielding, raised computer floors, redundant
utilities, pre-wired work stations, engineering offices, computer
rooms/microcomputer lab, fire protection, and interior security
features. The building will also include an enclosed walkway to other
facilities. Site improvements will include sidewalks, a parking area,
and complete landscaping. Technical Support Facility: A new 30,000 sf
building to provide space for operations support staff and
administrative personnel. The building will include raised computer
floors, a pre-wired computer room, and a comprehensive interior design.
The building will also include a fire protection system. Site
improvements will include a new parking area, sidewalks, and
landscaping. Add/Alter Operational Support Facility: Addition and
alteration of approximately 12,000 sf for the existing Operational
Support Facility to support additional personnel. The renovations
include reconfiguring primarily administrative space to accommodate the
larger staff as well as enlarging an existing dental clinic to 300 sf.
Use of the metric system of measurement may be required for some
deliverables under the proposed contract, however, metric system
experience is not required for selection. The estimated construction
cost is between $20,000,000 and $25,000,000. SELECTION CRITERIA: See
Note 24 for general selection process. Criteria for selection, in order
of importance, are: (a) Recent specialized experience and technical
competence of the firm (including consultants) in: (1) Design of
similar computer and communication facilities with raised floors and
the associated computer/communications support features. (2) Design of
RFI Shielding.(3) Producing quality designs as evidenced by the firm's
quality control procedures. The A-E must be able to provide designs
that meet guidance and criteria without detailed review by the
District. (4) Effective coordination and management of the project
team, including consultants. (5) Conducting design charrettes. (6)
Construction cost estimating and preparation of estimates on IBM
compatible personal computers using Corps of Engineers Micro- Computer
Aided Cost Estimating System (M- CACES) GOLD version or similar system
(M-CACES software will be provided). (7) Producing Computer Aided
Drafting and Design (CADD) drawings fully compatible with Autocad
version 12. (b) Professional qualifications and specialized experience
in providing services similar to those listed above of the proposed
team members (including consultants) in the following disciplines:
Architect, Structural Engineer, Electrical Engineer, Mechanical
Engineer, Fire Protection Engineer, Environmental Engineer, Civil
Engineer, Interior Designer. (c) Capacity to perform the work in the
required time. (d) Past performance as described in Note 24. (e)
Location in the general geographic area of the project and knowledge of
the locality of the project. (f) Extent of participation of SB, SDB,
historically black colleges and universities, and minority institutions
in the proposed contract team, measured as a percentage of the
estimated effort. (g) Volume of DOD contract awards in the last 12
months as described in Note 24. SUBMITTAL REQUIREMENTS: Solicitation
packages are not provided for A-E contracts. This is not a request for
proposal. Firms desiring consideration shall submit two copies of a
combined SF 255 and separate SFs 254 for prime and each consultant. To
be considered, submittals must be addressed as follows: U.S. Army
Corps of Engineers, Omaha District, CEMRO-ED-C, ATTN: John M. Miller,
215 N. 17th Street, Omaha, NE 68102-4978. Submittals must be received
no later than close of business on the 30th day after the date of
publication of this announcement. If the 30th day is a Saturday or
Sunday or a federal holiday, the deadline will be the close of business
on the next business day. In block 10 of the SF 255, provide the
following: (a) Design Management Plan (DMP). The DMP should be brief
and include an explanation of the firm's management approach,
management of subcontractors (if applicable), specific quality control
procedures used and an organizational chart showing the
inter-relationship of management and various team components (including
subcontractors). (b) The firm's present workload and the availability
of the project team (including consultants) for the specified contract
performance period. (c) The firm's past performance and familiarity
with the charrette process through use of in-house staff or consultant.
In block 7 of SF 255 include team member's experience in participating
on interactive conceptual design teams (charrettes). In block 3 of SF
255 provide the submitting firm's number (six or seven digits)
assigned by the North Pacific Division, U.S. Army Corps of Engineers,
for the Architect-Engineer Contract Administration Support System
(ACASS) and the firm number for any consultants in block 6 of the SF
255. If unknown, so state. To receive information to obtain an ACASS
number, call (503) 326-3459. Personal visits for this solicitation to
the Omaha District offices or the project site will not be scheduled.
Administrative and procedural questions shall be directed to John M.
Miller at (402) 221-4176. See Numbered Note(s): 24. (0067) Loren Data Corp. http://www.ld.com (SYN# 0037 19960308\C-0004.SOL)