|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 26,1996 PSA#1538Naval Research Laboratory, 4555 Overlook Ave., S.W., Washington, D.C.
20375-5326 43 -- HIGH PRESSURE AIR COMPRESSOR AND AIR DRYER SOL N00014-96-Q-CRO3
POC Alan W. Crupi, Contract Specialist, Code 3220.CR, (202) 767-2550
and Kevin King, Contracting Officer, Code 3220.KK. The purpose of this
modification is to establish the folowing: procedure for award
(written quotations), small business set- aside requirement, revise the
wording for charging rate to free air delivery rate and revise the
delivery date. The Naval Research Laboratory (NRL) has a requirement
for a high-pressure air compressor(s) (HPAC) and air dryer for filling
self-contained breathing apparatus (SCBA) air cylinders. The SCBA
cylinders will be filled with Grade E breathing air to a pressure of
4500 pounds per square inch (PSI). The HPAC will not produce the Grade
E air without the aid of a booster pump and purification equipment
that NRL will obtain from other sources. The complete system of air
compressor, air flasks. booster pump, and purification equipment will
be installed and piped together by NRL personnel onboard the ex-USS
Shadwell, a full-scale damage control platform. The output from the
compressor may be the resultant of one compressor or more, operating
together to create the final output. The performance of the HPAC
equipment must meet the following requirements: oil-free compression,
free air delivery rate of 60- 65 standard cubic feet per minute (SCFM),
and an output pressure of 3000 PSI. Furthermore, the supplier must
provide an air dryer compatible with the HPAC output. The air dryer
must come equipped with a five (5) foot long flexible high-pressure
hose that NRL will use in the system assembly. All electrical motors
used on the HPAC must have totally-enclosed fan cooled (TEFC)
enclosures and operate on 460 volts-alternating current (VAC), 3
phrase, 60 Hertz electricity. The supplier will not be responsible for
the assembly of the complete system, only their high-pressure air
compressor and air dryer, although those two items are not necessarily
required to be assembled to one another. Delivery is FOB destination
Mobile, AL with a required delivery date of ninety (90) days after
receiving order. All responsible sources may submit a quotation which,
if timely received, shall be considered. Telephone requests for this
Request For Quotes (RFQ) will not be honored. Those companies
requesting a copy of N00014- 96-R-CR03 need not reapply. Send requests
for RFQ to: Contracting Officer, Attn: Code: 3220.CR, Naval Research
Laboratory, 4555 Overlook Avenue SW, Washington, DC 20375-5326.
Facsimile requests may be sent to (202) 767-5896/6197. Reference
Synopsis N00014-96- Q-CR03. (0053) Loren Data Corp. http://www.ld.com (SYN# 0234 19960223\43-0001.SOL)
43 - Pumps and Compressors Index Page
|
|